Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cleaning Work Of Khategaon Talab With All Required Labour Work Boat And Machinery Including Dumping Of Sludge And Waste From Talab
|
Description |
Cleaning Work Of Khategaon Talab With All Required Labour Work Boat And Machinery Including Dumping Of Sludge And Waste From Talab
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2295 |
EMD | 4100 |
Tender Value | |
Place | Khategaon |
Link |
AAAAAAAAAA Login to view |
Start Date | July 02, 2025 14:30 |
End Date |
16/07/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Completereplacement of old rubberseal with newone including replacement of nuts andbolts i.r.o.11 nos. spillwayradialgates and 01no.flap spillwayradialgates and painting of all hydro-mech.equip. as perspecifications and scope of work/boq at salal ps.
Completereplacement of old rubberseal with newone including replacement of nuts andbolts i.r.o.11 nos. spillwayradialgates and 01no.flap spillwayradialgates and painting of all hydro-mech.equip. as perspecifications and scope of work/boq at salal ps.
Read moreCleaning work of entrance premises of authority office along with material, staff, tools and plant items.
Cleaning work of entrance premises of authority office along with material, staff, tools and plant items.
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Read moreCement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07
Cement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07
Read moreRepair and restoration of all field hostels with pvc lining and tile work around guest house and exe. field hostel at sewa-ii power station maska (j and k) (cw-683)
Repair and restoration of all field hostels with pvc lining and tile work around guest house and exe. field hostel at sewa-ii power station maska (j and k) (cw-683)
Read moreSurface cleaning and painting work of tower structures (819.028mt) of 220kv nagda-neemuch and 132kv jaora-mandsour line under eht-maint. dn.ratlam on labour contract basis
Surface cleaning and painting work of tower structures (819.028mt) of 220kv nagda-neemuch and 132kv jaora-mandsour line under eht-maint. dn.ratlam on labour contract basis
Read moreSurface cleaning and painting work of tower structures (799.82mt) of 132kv ratlam-badnagar and 132kv ratlam-petlawad tap bamniya rts lines under eht-maint.dn. ratlam on labour contract basis
Surface cleaning and painting work of tower structures (799.82mt) of 132kv ratlam-badnagar and 132kv ratlam-petlawad tap bamniya rts lines under eht-maint.dn. ratlam on labour contract basis
Read moreLabour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Labour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreDismantling, shifting of old 40 mva transformer (bharat bijlee make) and erection of 63 mva transformer with all associated work
Dismantling, shifting of old 40 mva transformer (bharat bijlee make) and erection of 63 mva transformer with all associated work
Read moreof your Industry type