Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Custom Bid Invitation: Design, Supply, Installation, Testing, And Commissioning Of Cooling Tower 💧 Indian Oil Corporation Limited, Under The Ministry Of Petroleum And Natural Gas, Is Seeking Proposals For The End To End Service Of Design, Supply, Installation, Testing, And Commissioning Of A Cooling Tower. 🛠️ 🗓️ Proposal Submission Deadline: April 8, 2024, 3:00 Pm Interested Parties Should Submit Detailed Proposals, Showcasing Their Capability To Deliver A Comprehensive Solution That Meets The Technical And Operational Requirements Of The Project. Keywords: Indian Oil Corporation Limited, Cooling Tower, Design, Supply, Installation, Testing, Commissioning, Government Tender, Ministry Of Petroleum And Natural Gas| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Design Supply Installation Testing Commissioning Of Cooling Tower And Co
|
| Description |
|
| Organisation | INDIAN OIL CORPORATION LIMITED | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/4694336 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 21, 2024 21:03 |
| End Date |
Expired
08/04/2024
Expired 923 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
M/S ABET COOLING SYSTEMS
389000
Technical Evaluation Results
| S.No. | Seller Name | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|
| 1 | ACTIVE COOLING TOWERS | 08-04-2024 12:43:43 | MSE | Qualified |
| 2 | M/S ABET COOLING SYSTEMS | 08-04-2024 13:07:50 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | M/S ABET COOLING SYSTEMS( MSE Social Category:SC ) | Item Categories : Custom Bid for Services - Design Supply Installation Testing Commissioning of Cooling Tower and Co | 389000.00 | L1 |
| 2 | ACTIVE COOLING TOWERS( MSE Social Category:OBC ) | Item Categories : Custom Bid for Services - Design Supply Installation Testing Commissioning of Cooling Tower and Co | 450000.00 | L2 |
Ordered Items & Contract Pricing
| Service | Category Name | Ordered Quantity | Price |
|---|---|---|---|
| Custom Bid for Services - Design Supply Installation Testing Commissioning of Cooling Tower and Cooling Water Pump at Bhavnagar BP | Custom Bid for Services | 1 | ₹ 389000.000 |
Design, supply, installation, testing and commissioning (dsitc) of 250 (2 x 125) tr induced draft cooling tower (by replacement of the existing cooling tower)
Design, supply, installation, testing and commissioning (dsitc) of 250 (2 x 125) tr induced draft cooling tower (by replacement of the existing cooling tower) at 2nd floor terrace of rbi main office building, bhopal
Read moreSitc for lifting arrangement at cooling tower
Sitc for lifting arrangement at cooling tower
Read moreDsitc of cooling tower at mob, mumbai
Design, supply, installation, testing, and commissioning (dsitc) of cooling tower for banks office building at fort, mumbai
Read moreCustom bid for services - vrcfp bcw cooling tower
Custom bid for services - vrcfp bcw cooling tower
Read moreCustom bid for services - mechanical overhauling contract of cooling tower ct-03 of c2c3 recovery unit, gail vijaipur on oem basis from paharpur cooling tower
Custom bid for services - mechanical overhauling contract of cooling tower ct-03 of c2c3 recovery unit, gail vijaipur on oem basis from paharpur cooling tower
Read moreService for chemical treatment of cooling water - cooling towers induced draft cooling tower (idct) chemical dosing plan, periodic testing of cooling water parameters, installation/maintenance of dosing systems (if applicable), adjustment of treatm..
Service for chemical treatment of cooling water - cooling towers induced draft cooling tower (idct) chemical dosing plan, periodic testing of cooling water parameters, installation/maintenance of dosing systems (if applicable), adjustment of treatm..
Read moreSupply of cooling water treatment chemicals along with treatment monitoring and operation of cooling tower 1 3 and 4 at paradip refinery
Supply of cooling water treatment chemicals along with treatment monitoring and operation of cooling tower 1 3 and 4 at paradip refinery
Read moreNlcil- btps-civil- repair & strengthening work of induced draft cooling tower (idct unit-1)
Nlcil- btps-civil- repair & strengthening work of induced draft cooling tower (idct unit-1)
Read moreDesign, manufacturing, sitc of horizontal centrifugal water pump motor for cooling water pump
Design, manufacturing, sitc of horizontal centrifugal water pump motor for cooling water pump
Read moreof your Industry type