Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Tn Mm 2075 Supply, Erection, Testing And Commissioning/ Up Gradation Work Of Ge Fanuc (Presently Known As Emerson) Make Plc System Installed For Dry Fly Ash Evacuation System Of Unit 6, Ahp Iv, Stps, Suratgarh
|
Description |
Supply, Erection, Testing And Commissioning/ Up Gradation Work Of Ge Fanuc (Presently Known As Emerson) Make Plc System Installed For Dry Fly Ash Evacuation System Of Unit 6, Ahp Iv, Stps, Suratgarh
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2090 |
EMD | 1.26 Lakh |
Tender Value | |
Place | O/o Dy CE (Proc.), ADM Building, STPS, Suratgarh |
Link |
AAAAAAAAAA Login to view |
Start Date | June 19, 2025 16:30 |
End Date |
01/07/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tn-mm-2075 supply, erection, testing and commissioning/ up gradation work of ge fanuc (presently known as emerson) make plc system installed for dry fly ash evacuation system of unit 6, ahp- iv, stps, suratgarh
Supply, erection, testing and commissioning/ up gradation work of ge fanuc (presently known as emerson) make plc system installed for dry fly ash evacuation system of unit 6, ahp- iv, stps, suratgarh
Read moreProcurement of spares of 65 nb dual disk sliding type equalizing/ vent valve installed in fly ash evacuation system of stps-iv, sarni.
Procurement of spares of 65 nb dual disk sliding type equalizing/ vent valve installed in fly ash evacuation system of stps-iv, sarni.
Read moreProcurement of spares for sam turbo make silo drain sump pump, fly ash drain pump and column assembly , casing assembly,bearing housing assembly of bottom ash overflow pump installed in ahp of ph-iv stps,sarni.
Procurement of spares for sam turbo make silo drain sump pump, fly ash drain pump and column assembly , casing assembly,bearing housing assembly of bottom ash overflow pump installed in ahp of ph-iv stps,sarni.
Read moreUp gradation of emerson automation make plc system with 2 no. of work station with latest operating software and license key , scada and logic software and antivirus at ph 4 of stps sarni
Up gradation of emerson automation make plc system with 2 no. of work station with latest operating software and license key , scada and logic software and antivirus at ph 4 of stps sarni
Read moreRepair of electronic modules of honeywell make lm-plc system installed in dry fly ash handling system, ggsstp, rupnagar
Repair of electronic modules of honeywell make lm-plc system installed in dry fly ash handling system, ggsstp, rupnagar
Read moreTn-mm-2045 supply of clinker grinder and spares for bottom ash hopper , fly ash deashing system of ash handling plant stage -1 to iii ahp stps , suratgarh
Tn-mm-2045 supply of clinker grinder and spares for bottom ash hopper , fly ash deashing system of ash handling plant stage -1 to iii ahp stps , suratgarh
Read moreSupply, installation and commissioning of latest pacs rx3i plc system to up-grade existing m/s ge-fanuc make series 90-30 plc system at dm plant of unit no. 5, 500 mw, sgtps, birsinghpur
Supply, installation and commissioning of latest pacs rx3i plc system to up-grade existing m/s ge-fanuc make series 90-30 plc system at dm plant of unit no. 5, 500 mw, sgtps, birsinghpur
Read moreWork contract upgradation of plc and scada system of existing emerson (formaly known as ge-ip) make plc system installed at control room of chp 210 mw atps mppgcl chachai.
Work contract upgradation of plc and scada system of existing emerson (formaly known as ge-ip) make plc system installed at control room of chp 210 mw atps mppgcl chachai.
Read moreSupply of spares for lk make (erstwhile lnt make) lt system installed in lt switch gear, ahp system, ccu panel of transformers and dg for stage-i, ii, iii and iv of stps, suratgarh.
Supply of spares for lk&#x0d make (erstwhile lnt make) lt system installed in&#x0d lt switch gear, ahp&#x0d system, ccu panel of transformers&#x0d and dg for stage-i,&#x0d ii, iii and iv of stps,&#x0d suratgarh.
Read moreDismantlement erection and commissioning of damaged pipes of secondary ash conveying pipe line of dry fly ash handling system installed at ggsstp ropar
Dismantlement erection and commissioning of damaged pipes of secondary ash conveying pipe line of dry fly ash handling system installed at ggsstp ropar
Read moreof your Industry type