Tender Details
Particulars | Details |
---|---|
Title |
Erection Of Wooden Huts In Patrol Routes At Tapola, New Adv Patrol Base, Pumpung Sherpa, And Andrathang (Between A/Omkar To Zikyen La And A/Omkar To Andrala Axis) Of 9th Bn Itbp
|
Description |
Erection Of Wooden Huts In Patrol Routes At Pumping Sherpa Andrathang (Between Andrala Omkar To Andrala At Gr 886702 Gr 855733) And New Advance Patrol Base Tapola (Between Andrala Omkar To Zikyen La At Gr 782703 Gr 817684) Of 9th Bn, Itbp.
|
Organisation | DG, Indo-Tibetan Border Police Force | Central Govt. Ministry/Department |
Tender Id | 2024_ITBP_798251_1 |
Reference Number |
SHQ/DBRG/ENG/9Bn/Wooden Hut/2024-208 |
Tender Fee | 0 |
EMD | 3.13 Lakh |
Tender Value | |
Place | 9th Bn, ITBP Lohitpur |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=839086 |
Start Date | March 01, 2024 21:30 |
End Date |
15/03/2024 ( Expired 451 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bifurcation of 11 kv falaknuma ug cable feeder
Bifurcation of overloaded 11kv falaknuma ug cable feeder emanating from 33/11kv falaknuma ss by erection of new 11kv feeder from the same ss by laying of 1.6km of 11kv 3x185sq.mm. xlpe ug cable along with bay extension and erection of 11kv vcb at 33/11kv falaknuma sub station in miralam section of miralam sub division of charminar division of hyderabad south circle under t and d improvement to original works under general category
Read moreT no 02 of 2025-26
Providing, erecting, testing and commissioning of new transformer andrepairs to existing dp structure in switchyard and overhauling of lt motors with repairs to lt panel and erection of lightning arrangement in pump house area at kiwala lift irrigati
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreConstruction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Construction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Read more1)work of erection of new 100kva dtc at saliswaddo parra in order to solve low voltage problem faced by the locals of saliswaddo and gamawaddo, parra work of erection of new 200kva dtc at sanqwadi arpora in order to solve low voltage problem faced
1)work of erection of new 100kva dtc at saliswaddo parra in order to solve low voltage problem faced by the locals of saliswaddo and gamawaddo, parra 2)work of erection of new 200kva dtc at sanqwadi arpora in order to solve low voltage problem faced
Read moreAmc of 14 nos lifts installed in family quarters from block a to e 120 men barrack and nirmal bwwa complex for one year fy 2025 26 at 25 bn bsf chhawla under dig hq fhq bsf new delhi
Amc of 14 nos lifts installed in family quarters from block a to e 120 men barrack and nirmal bwwa complex for one year fy 2025 26 at 25 bn bsf chhawla under dig hq fhq bsf new delhi
Read moreDismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area
Dismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area
Read moreWork of erection of ht and lt oh lines and allied work in order to commission new 200 kva dtc installed under rdss scheme to release 1 no of ltc connection to smt apeksha s. korgaonkar,at vaghbil ,camurlim under the so colvale,sd ii div xvii mapusa
Work of erection of ht and lt oh lines and allied work in order to commission new 200 kva dtc installed under rdss scheme to release 1 no of ltc connection to smt apeksha s. korgaonkar,at vaghbil ,camurlim under the so colvale,sd ii div xvii mapusa
Read moreSpecial repair to bldg no t-83 (ng bn), t-100 (cg bn) and provn of 3 x septic tank for offr living (cg bn) at base camp in age b/r-ii area under ge 873 ews
Special repair to bldg no t-83 (ng bn), t-100 (cg bn) and provn of 3 x septic tank for offr living (cg bn) at base camp in age b/r-ii area under ge 873 ews
Read moreDeposit rwss to perinad grama panchayath construction of pump house,commissioning of new tube well, allied works including supplying and erection of pump and bleaching powder stacking room in at harippadu junction in ward no.13
Deposit rwss to perinad grama panchayath construction of pump house,commissioning of new tube well, allied works&#x0d including supplying and erection of pump set&#x0d and bleaching powder stacking room in at&#x0d harippadu junction in ward no.13&#x0d
Read moreof your Industry type