Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstructing Damaged Portion Of Compound Wall At 220k V Gis Substation, Vizhinjam
|
| Description |
Reconstructing Damaged Portions And Maintenance Of Other Portion Of Compound Wall At 220k V Gis Substation, Vizhinjam
|
| Organisation | Kerala State Electricity Board | State Govt. and UT |
| Tender Id | 2024_KSEB_707161_1 |
|
Reference Number |
02/TSD-NTA/2024 - 25/dtd 19.11.2024 |
| Tender Fee | 5900 |
| EMD | 50000 |
| Tender Value | - |
| Place | 220kV GIS Substation, Vizhinjam |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1108319 |
| Start Date | November 23, 2024 15:30 |
| End Date |
Expired
16/12/2024
Expired 664 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material
Replacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material & as per tender document
Read moreRestoration of damaged cc road by laying new cc road in place of widening portion from gowshala to garbage transfer station, jiyaguda temple on 100 feet road under jiyaguda-138, karwan circle-31, gz, ghmc.
Restoration of damaged cc road by laying new cc road in place of widening portion from gowshala to garbage transfer station, jiyaguda temple on 100 feet road under jiyaguda-138, karwan circle-31, gz, ghmc.
Read moreRestoration of damaged cc road by laying new cc road in place of widening portion from garbage transfer station, jiyaguda to 2j bus stop on 100 feet road under jiyaguda-138, karwan circle-31, gz, ghmc.
Restoration of damaged cc road by laying new cc road in place of widening portion from garbage transfer station, jiyaguda to 2j bus stop on 100 feet road under jiyaguda-138, karwan circle-31, gz, ghmc.
Read moreDc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis
Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis
Read moreErection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works
Read moreErection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 62 of hmda layout in medipally with 1x16 mva ptr, connected 33kv and 11 kv lines in narapally section of ghatkesar sub-division in keesara division of habsiguda operation circle, in master plan sub-division 2 of wcgh division in rangareddy master plan circle under t and d improvement works.
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 62 of hmda layout in medipally with 1x16 mva ptr, connected 33kv and 11 kv lines in narapally section of ghatkesar sub-division in keesara division of habsiguda operation circle, in master plan sub-division 2 of wcgh division in rangareddy master plan circle under t and d improvement works.
Read moreReconstructing damaged portion of compound wall at 220kv gis substation, vizhinjam
Reconstructing damaged portion and maintenance of other portion of compound wall at 220kv gis substation, vizhinjam
Read moreConstruction of rmu yard and vehicle shed at 220kv gis substation vizhinjam
Construction of rmu yard and vehicle shed at 220kv gis substation vizhinjam
Read more220kv gis mannarkkad - construction of compound wall for the proposed 220kv gis substation at mannarkkad
220kv gis mannarkkad - construction of compound wall for the proposed 220kv gis substation at mannarkkad
Read moreConstruction of compound wall for 220kv gis substation at irinjalakuda
Construction of compound wall for 220kv gis substation at irinjalakuda - retaining wall with rcc, compound wall using solid block bricks, fencing with gi barbed wire, plastering, painting etc
Read moreof your Industry type