Tender Details
Particulars | Details |
---|---|
Title |
Catenary Wire Ending Clamp [65 Sq.Mm]
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106588341 |
Reference Number |
86245992A |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106588341/viewNitPdf_4844403.pdf |
Start Date | January 23, 2025 23:47 |
End Date |
20/02/2025 ( Expired 82 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
6mm steel wire rope,steel wire rope 8mm dia 6/19,10mm galvanized wire rope,wire rope as per is 4521
Read more
Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Read moreItem 1- vertical, column and boom type automated hot wire gas tungsten arc welding gtaw hard-facing
Read more
Concentric reducer, size 80 x 65 nb, bw, sa 420 wpl6 class-1 as per ts no. pb-m-48 (r-4) & addenda,
Read more
Construction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Construction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana
Read moreUpgradation of existing bridge (peru) at km 27.595 by 65 m span pmt bridge, existing 60.45 m span rcc t beam bridge (dhunari) at km 48.846 by constructing 65 m span pmt bridge, and existing 365.00 m span rcc t beam bridge (ujh) at km 54.380 by cons
Upgradation of existing bridge (peru) at km 27.595 by 65 m span pmt bridge, existing 60.45 m span rcc t beam bridge (dhunari) at km 48.846 by constructing 65 m span pmt bridge, and existing 365.00 m span rcc t beam bridge (ujh) at km 54.380 by cons
Read moreof your Industry type