Tender Details
Particulars | Details |
---|---|
Title |
Installation And Fixing Of Fabric Expansion Joint Over Existing Metallic Compensator To Arrest Air Ingress During Capital Overhauling Of Unit 6 Of 2x250 Mw, Ctps, Ptpp, Parichha
|
Description |
Installation And Fixing Of Fabric Expansion Joint Over &Amp#X0d
Existing Metallic Compensator To Arrest Air Ingress During &Amp#X0d
Capital Overhauling Of Unit 6 Of 2x250 Mw, Ctps, Ptpp, &Amp#X0d
Parichha
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2025_RVUNL_1016498_1 |
Reference Number |
N-PAR/C/OMC2/BMD1/6000007746 |
Tender Fee | 590 |
EMD | 8000 |
Tender Value | |
Place | BMD-I/OMC-II/CTPS.PTPP PARICHHA JHNASI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1832084 |
Start Date | March 12, 2025 23:30 |
End Date |
03/04/2025 ( Expired 53 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Read moreLifting and disposal of dry/wet ash accumulated under esp and bah area and in peripheral drain trenches during overhauling of unit no.6 2x250mw ash handling plant ptpp parichha
Lifting and disposal of dry/wet ash accumulated under esp and bah area and in peripheral drain trenches during overhauling of unit no.6 2x250mw ash handling plant ptpp parichha
Read moreOverhauling of cmrh system and its other associated work of unit no. 6 of 2x250 mw ctps, parichha during overhauling of unit 6
Overhauling of cmrh system and its other associated work of unit no. 6 of 2x250 mw ctps, parichha during overhauling of unit 6.
Read moreSupply, installation and commissioning of fabric compensator for expansion joints of unit no. 13 (overhauling), btps, obra, sonebhadra, u.p.
Supply, installation and commissioning of fabric compensator for expansion joints of unit no. 13 (overhauling), btps, obra, sonebhadra, u.p.
Read moreCon of non ac superfast / deluxe buses (supply, installation, and commissioning - retro fitment) to battery powered air condition unit for 10 existing buses
Con of non ac superfast / deluxe buses (supply, installation, and commissioning - retro fitment) to battery powered air condition unit for 10 existing buses
Read moreSupply and installation of battery charger cum engine er,
Supply and installation of battery charger cum engine er, &#x0d 12 vdc 180ah for 28 kw diesel engine fire pump in 2x250 &#x0d mw, ptpp, parichha, jhansi.
Read moreSupervisory service work for boiler pressure parts, safety valves and esp during capital overhauling of unit no. 06 of 2x250mw, ctps, ptpp, parichha jhansi
Supervisory service work for boiler pressure parts, safety valves and esp during capital overhauling of unit no. 06 of 2x250mw, ctps, ptpp, parichha jhansi
Read moreOverhauling of 02 nos. air pre-heater, reversal and replacement of baskets, replacement of coal compartment assembly and other associated works of boiler required during capital overhauling of unit6, 2x250mw, ctps, parichha, jhansi
Overhauling of 02 nos. air pre-heater, reversal and replacement of baskets, replacement of coal compartment assembly and other associated works of boiler required during capital overhauling of unit6, 2x250mw, ctps, parichha, jhansi
Read moreProcurement of expansion joint between economizer outlet to air pre heater inlet damper for unit i and ii
Procurement of expansion joint between economizer outlet to air pre heater inlet damper for unit i and ii
Read moreMtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Read moreof your Industry type