Tender Details
Particulars | Details |
---|---|
Title |
Construction Of New Double Storied Market Shed And Stalls (Block A And Block B) At Kalshi, Jolaibari, South Tripura Under Ridf Scheme
|
Description |
Construction Of New Double Storied Market Shed And Stalls (Block A And Block B) At Kalshi, Jolaibari, South Tripura Under Ridf Scheme
|
Organisation | Government of Tripura |
Tender Id | 2023_CERDD_43166_1 |
Reference Number |
44/MARKET KALSHI/CE/RDD/STB/DNIT/23-24 11/10/23 |
Tender Fee | 8000 |
EMD | 8.96 Lakh |
Tender Value | |
Place | O/o the Executive Engineer RD Santirbazar Division |
Link | https://tripuratenders.gov.in |
Start Date | October 17, 2023 23:30 |
End Date |
14/11/2023 ( Expired 574 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of critical care block at district hospital rupnagar under pm abhim scheme
Construction of critical care block at district hospital rupnagar under pm abhim scheme
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreImplementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)
Read moreInstallation and operating of 10 m.t. weighing bridge under bot scheme
Installation and operating of 10 m.t. weighing bridge under bot scheme at new mandi yard ashoknager distt. ashoknager
Read moreCa no.cwe bly/ge (e)/11 of 2025- 2026spl repair to bldg no p-339, p-340 incl water through in b charge and bldg no p-343 incl water through in new charge at rts and depot hempur under ge ( east) bareilly
Ca no.cwe bly/ge (e)/11 of 2025- 2026spl repair to bldg no p-339, p-340 incl water through in b charge and bldg no p-343 incl water through in new charge at rts and depot hempur under ge ( east) bareilly
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kankhoya kali mandir zone-37 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kankhoya kali mandir zone-37 asansol under amrut 2.0 phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreof your Industry type