Tender Details

Particulars Details
Title
Construction Of Retaining Wall Along The Road Near Royal Architect Building At Murda Grande In V.P. Nuvem In Nuvem Constituency
Description
Construction Of Retaining Wall Along The Road Near Royal Architect Building At Murda Grande In V.P. Nuvem In Nuvem Constituency
Organisation Government of Goa
Tender Id 2023_ZP_12773_1
Reference
Number
3/6/SGZP/2023-24/TN-144/L26
Tender Fee 3000
EMD 14473
Tender Value
Place Office of South Goa Zilla Panchayats Margao-Goa.
Link https://eprocure.goa.gov.in
Start Date December 05, 2023 19:30
End Date

20/12/2023 ( Expired 554 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Read more
Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe

Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe

Read more
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Read more
Wbphed/ee/md/niet_22 (3rd call) of 2025-2026, sl.no.05

Augmentation of boundary wall, pump house, blower room and construction pathway and approch road at head work site of maheshpur water supply scheme of englishbazar block under malda division, p.h.e.dte. in the district of malda. (3rd call)

Read more
Construction of surface drain, c.c. road and toe wall etc. at 1 no. s.s. colony near tribeni shibpur foot ball ground, (60 m) and at gafur basti (400 m) in ward no-12.

Construction of surface drain, c.c. road and toe wall etc. at 1 no. s.s. colony near tribeni shibpur foot ball ground, (60 m) and at gafur basti (400 m) in ward no-12.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise