Tender Details

Particulars Details
Title
Construction Of Minor Bridge On Pahur Jalgaon Kingaon Vaghzira Langadya Amba Jamnya Gadrya Shirvel Road Sh 42 At Km 74/600, 74/900 Tal.Yawal Dist. Jalgaon
Description
Construction Of Minor Bridge On Pahur Jalgaon Kingaon Vaghzira Langadya Amba Jamnya Gadrya Shirvel Road Sh 42 At Km 74/600, 74/900 Tal.Yawal Dist. Jalgaon
Organisation Public Works Region | State Govt. and UT
Tender Id 2024_PWR_1110272_2
Reference
Number
ET No 04 for 2024-25 (Six call)
Tender Fee 2860
EMD 1.5 Lakh
Tender Value
Place Yawal
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1938970
Start Date October 09, 2024 20:30
End Date

16/10/2024 ( Expired 235 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road

Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Read more
Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124

Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124

Read more
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Read more
Construction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik

Construction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise