Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Rear Sliding Sash Assembly 🛠️ The Ministry Of Railways, Under The Central Government, Invites Tenders For The Supply Of Rear Sliding Sash Assembly For A Project Based In Kolkata. 📄 🗓️ Submission Deadline: June 10, 2024, 2:00 Pm Tender Fees: Nil Emd: Nil Interested Vendors Must Refer To The Tender Document For Complete Details And Specifications. Detailed Bids, Including Pricing And Delivery Schedules, Are To Be Submitted Before The Stipulated Deadline. Keywords: Rear Sliding Sash Assembly, Ministry Of Railways, Central Government, Tender, Procurement, Kolkata| Particulars | Details |
|---|---|
| Title |
Rear Sliding Sash Assy.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106345304 |
|
Reference Number |
17233017B |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/062024/106345304/viewNitPdf_4569809.pdf |
| Start Date | May 14, 2024 16:36 |
| End Date |
Expired
10/06/2024
Expired 852 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area
Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area
Read moreHiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreof your Industry type