Tender Details

About Tender

🛣️ Invitation For Bids: Strengthening Of Service Roads On Nh 147 🛣️ The Ministry Of Road Transport And Highways, Central Government, Invites Bids For The Epc (Engineering, Procurement, And Construction) Mode Project For The Strengthening Of Service Roads On Nh 147, Chiloda Gandhinagar Sarkhej Road, Km. 0/000 To 44/040, In The State Of Gujarat. Job No. 147/Gj/2023 24/741. 📅 Bid Submission Deadline: April 29, 2024, 12:00 Pm Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 12,46,000 Interested Bidders Must Possess The Requisite Qualifications And Experience In Similar Infrastructure Projects. Detailed Bids, Including Technical And Financial Proposals, Are To Be Submitted As Per The Tender Documents. Keywords: Epc Mode, Infrastructure, Road Construction, Nh 147, Ministry Of Road Transport And Highways, Central Government, Tender, Bid Submission, Earnest Money Deposit
Particulars Details
Title
Strengthening Of Service Roads Of Nh 147 Chiloda Gandhinagar Sarkhej Road Km. 0/000 To 44/040 In The State Of Gujarat On Epc Mode. Job No. 147/Gj/2023 24/741
Description
Strengthening Of Service Roads Of Nh 147 Chiloda Gandhinagar Sarkhej Road Km. 0/000 To 44/040 In The State Of Gujarat On Epc Mode. Job No. 147/Gj/2023 24/741
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_800515_1
Reference
Number
22 of 2023-2024
Tender Fee 10000
EMD 12.46 Lakh
Tender Value -
Place Gandhinagar
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841486

Start Date March 14, 2024 00:25
End Date
Expired 25/07/2024

Expired 809 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
2nd attempt strengthening of service roads of nh-147 chiloda-gandhinagar-sarkhej road km. 0/000 to 44/040 in the state of gujarat on epc mode. job no. 147/gj/2023-24/741

2nd attempt strengthening of service roads of nh-147 chiloda-gandhinagar-sarkhej road km. 0/000 to 44/040 in the state of gujarat on epc mode. job no. 147/gj/2023-24/741

Read more
5th attempt annual rates for works of national highway no. 147 km. 0/00 to 44/040 (chiloda-gandhinagar- sarkhej highway) for providing asphalt patch, patta and road surfacing etc., in jurisdiction of dy. ex. engr., n. h. sub dn., gandhinagar

5th attempt annual rates for works of national highway no. 147 km. 0/00 to 44/040 (chiloda-gandhinagar- sarkhej highway) for providing asphalt patch, patta and road surfacing etc., in jurisdiction of dy. ex. engr., n. h. sub dn., gandhinagar

Read more
Design and construction of transgenic green house at iit gandhinagar, palaj, gandhinagar in epc mode 1 - design and build basis.

Design and construction of transgenic green house at iit gandhinagar, palaj, gandhinagar in epc mode 1 - design and build basis.

Read more
Design engineering procurement for construction of integrated court complex 44 courts at district hathras up india on epc mode

Design engineering procurement for construction of integrated court complex 44 courts at district hathras up india on epc mode

Read more
Pmc work for construction of 44 nos court rooms for integrated court complex at hathras up india on epc mode

Pmc work for construction of 44 nos court rooms for integrated court complex at hathras up india on epc mode

Read more
Work of development of n.h-147 (old nh-8c) including 6-lanning with service road on either side from km.35/480 to 44/040 in the state of gujarat on epc basis.(bc overlay on risk and cost of package -4)

Work of development of n.h-147 (old nh-8c) including 6-lanning with service road on either side from km.35/480 to 44/040 in the state of gujarat on epc basis.(bc overlay on risk and cost of package -4)

Read more
2nd attempt work of development of n.h-147 (old nh-8c) including 6-lanning with service road on either side from km.35/480 to 44/040 in the state of gujarat on epc basis.(bc overlay on risk and cost of package -4)

2nd attempt work of development of n.h-147 (old nh-8c) including 6-lanning with service road on either side from km.35/480 to 44/040 in the state of gujarat on epc basis.(bc overlay on risk and cost of package -4)

Read more
Appointment of project management consultancy (pmc)for planning, design and construction under conventional/epc mode of contract for construction of temporary shed at sai rc gandhinagar

Appointment of project management consultancy (pmc)for planning, design and construction under conventional/epc mode of contract for construction of temporary shed at sai rc gandhinagar

Read more
Widening of 2l to 2l plus ps from km. 86/040 to km 91/770 and km 103/260 to km 107/870 of nh-on epc mode in the state of odisha

Widening of 2l to 2lplus ps from km. 86/040 to km 91/770 and km 103/260 to km 107/870 of nh-on epc mode in the state of odisha

Read more
Construction of flyover at parimpora junction and shalteng junction on srinagar bypass (nh 44) in the ut of j and k under road safety works on epc mode

Construction of flyover at parimpora junction and shalteng junction on srinagar bypass (nh 44) in the ut of j and k under road safety works on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise