Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tn No 51 2023 24 Sdo Dt 29 01 2024 Non Plan Upt
|
| Description |
Special Repairs To Eswarakandanallur Road Km.0/0 2/0
|
| Organisation | Highways | State Govt. and UT |
| Tender Id | 2024_HWAY_415023_1 |
|
Reference Number |
TN No 51 2023 24 SDO Dt 29 01 2024 Non Plan UPT |
| Tender Fee | 0 |
| EMD | 30000 |
| Tender Value | - |
| Place | Ulundurpet |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=493790 |
| Start Date | January 30, 2024 17:30 |
| End Date |
Expired
15/02/2024
Expired 972 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
452/ssm/2026(sl-29), dt. 09.10.2026
Installation of fan(171 nos.) and water purifier (41 nos.) with alied works in different schools(43 nos.) under kumarganj north clrc, kumarganj block in the district of dakshin dinajpur
Read moreWard no. 29 se 51 me ferrocover supply/fixing ka karya
Ward no. 29 se 51 me ferrocover supply/fixing ka karya
Read moreSbd no. 5 dt. 29-5-26 bop tota 03
Estimate for providing revetment and studs on right edge of river ravi d/s bop tota to stop loop formation and protect army bunkers, bases, and other defence installations and infrastructure in year 2026-27.
Read moreRefurbishment of the chlorine flow control arrangement of the 30kg/hr rated chlorinators at chlorine plant of 40 mgd wtp, under igwtp
Read moreRestoration of water distribution pipelines for the preparation of coagulant solution at vats which is dedicatedly used for silt and 3 x 20 mgd wtp within igwtp
Read moreRestoration of air breathing systems on 60 inch dia palta tallah water transmission main along pst 1 and adjacent to nst chamber with renovation of its valve chambers at igwtp
Read moreTn.09/sl.no.05/ccr division-ii/non plan work
Availing pump operator for vyasarpadi vehicular subway at km.4/4 of grand northern trunk road for the period from 01.11.2026 to 31.03.2027
Read moreTn.09/sl.no.03/ccr division-ii/non plan work
Availing pump operator for grand western trunk road at km.1/7 of chennai city roads section viii for the period from 01.11.2026 to 31.03.2027.
Read moreTn.09/sl.no.01/ccr division-ii/non plan work
Maintenance of thirumangalam foot over bridge with escalator at km 9/10 of inner ring road for the period from 01.11.2026 to 31.03.2027.
Read moreTn.09/sl.no.06/ccr division-ii/non plan work
Engaging stationed motor pump of capacity 100 hp for dewatering, in vyasarpadi vehicular subway at km.4/4 of grand northern trunk road for the period from 01.11.2026 to 31.01.2027
Read moreof your Industry type