Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Link Road Hawani To Banalag Via Lower Uptpur Including One Bridge Km. 0/00 To 4/085
|
| Description |
Formation Cutting, Retaining Structure Cross Drainage Work Granular Sub Base, Wmm Metalling And Tarring, Shoulders V Shape Side Drain Road Side Essential Parapets Road Signages
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_120817_1 |
|
Reference Number |
11191-11250 dated 10.11.2025 |
| Tender Fee | 10000 |
| EMD | 13.92 Lakh |
| Tender Value | |
| Place | Tauni Devi |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=177087 |
| Start Date | November 18, 2025 20:30 |
| End Date |
Expired
25/11/2025
Expired 237 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreTiruppur city municipal corporation_outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreM.t on link link road upper hawani to lower hawani to saryal km 0.0 to 1.500
P.l 20 mm thick pre mix carpet in km 0.0 to 1.500 under otmnp head
Read moreMissing link road from lakhau stand to bardadas asalu station via under bridge, km 0/0 to 2/800.
Missing link road from lakhau stand to bardadas asalu station via under bridge, km 0/0 to 2/800.
Read moreof your Industry type