Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Fabrication Of Base Plate /Frame For 4000 Gpm/2000 Gpm Pump Motor Set At Sb Workshop(ii) Fabrication Of Foot Valve 04 Nos. Bend 8 Nos. Short Piece Sluice Valve And N.R Valve 4 Nos. Pump Body Short Piece
|
Description |
For Fabrication Of Base Plate /Frame For 4000 Gpm/2000 Gpm Pump Motor Set At Sb Workshop(ii) Fabrication Of Foot Valve 04 Nos. Bend 8 Nos. Short Piece Sluice Valve And N.R Valve 4 Nos. Pump Body Short Piece 8 Nos.In Different Size For Pumping Of Nichit
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_336881_1 |
Reference Number |
GM/SA/AM(EnM)-NIT/2025-26/011 |
Tender Fee | 0 |
EMD | 3100 |
Tender Value | |
Place | SB W/Shop and NPC under Sijua Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349228 |
Start Date | June 04, 2025 22:30 |
End Date |
13/06/2025 ( Expired 13 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
For dismantling, cutting and transporting of structure(iron)of tippler shed, main haulage etc.at mudidih colliery(ii)and making, fabrication and fitting of pontoon with motor pump and base plate fitting size 21x21 ft
For dismantling, cutting and transporting of structure(iron)of tippler shed, main haulage etc.at mudidih colliery(ii)and making, fabrication and fitting of pontoon with motor pump and base plate fitting size 21x21 ft
Read moreLaying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Read more(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an
(1) making of 04 nos. of 
 motor dala end cover and 
 04 nos.bearing grease cap 
 of at akwmc for 150hp and 
 167 hp.(2) fabrication of 
 base plate h.t pump motor 
 to be installed at ocp 
 pump.(3) dismantling of 
 3000 gpm pump flow more an
Read moreFabrication of base plate /frame for 4000gpm/2000gpm pump motor set at sb workshop(ii) fabrication of foot valve 04 nos. bend 8 nos. short piece sluice valve and n.r valve 4 nos. pump body short piece
For fabrication of base plate /frame for 4000gpm/2000gpm pump motor set at sb workshop(ii) fabrication of foot valve 04 nos. bend 8 nos. short piece sluice valve and n.r valve 4 nos. pump body short piece 8 nos.in different size for pumping of nichit
Read moreVarious material handling work including 2 nos. of bed -plate fabrication , reinstalling of damaged 8 inch and 6 inch pipe (vertical range) and bend and short piece refabricating work at adic, kusunda area
Various material handling work including 2 nos. of bed -plate fabrication , reinstalling of damaged 8 inch and 6 inch pipe (vertical range) and bend and short piece refabricating work at adic, kusunda area
Read moreRepairing/fabrication of 02 nos. of base frame of 2000 gpm pump-motor (asp 250g) at s. b. project.
Repairing/fabrication of 02 nos. of base frame of 2000 gpm pump-motor (asp 250g) at s. b. project.
Read moreRepairing/modification of bed plate, fabrication of suction bend, delivery bend, foot valve bend, installation of pump motor (6000 gpm) at borira mines, docp under c.v. ara for dewatering of mines water.
Repairing/modification of bed plate, fabrication of suction bend, delivery bend, foot valve bend, installation of pump motor (6000 gpm) at borira mines, docp under c.v. ara for dewatering of mines water.
Read moreFabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.
Fabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.
Read moreFabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of nr valve and foot valve for operation of 1300 gpm and 2000 gpm pump at jehlitand sump under kdh ocp, nk area
Fabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of nr valve and foot valve for operation of 1300 gpm and 2000 gpm pump at jehlitand sump under kdh ocp, nk area
Read moreCasting and machining of phosphor bronze impeller 07 nos. and bearing bush 06 nos for pv ii pumps(ii) fabrication of middle chamber (including partition plate and guide vanes) for the 300gpm and 120/150 m mnp make pump at sbc workshop
Casting and machining of phosphor bronze impeller 07 nos. and bearing bush 06 nos for pv ii pumps(ii) fabrication of middle chamber (including partition plate and guide vanes) for the 300gpm and 120/150 m mnp make pump at sbc workshop under sijua
Read moreof your Industry type