Tender Details

Particulars Details
Title
Strengthening Of Service Road From Km 323.830 To Km 324.950 And Km 333.350 To Km 334.500 And (B) Construction Of Box Mnb At Km 333.033 On Karodi (Km 320.640) To Telwadi (Km 375.000) Road Section Of Nh 52 In The State Of Maharashtra On Epc Mode
Description
Strengthening Of Service Road From Km 323.830 To Km 324.950 And Km 333.350 To Km 334.500 And (B) Construction Of Box Mnb At Km 333.033 On Karodi (Km 320.640) To Telwadi (Km 375.000) Road Section Of Nh 52 In The State Of Maharashtra On Epc Mode
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_255611_1
Reference
Number
NHAI/RO-NAG/Tender/Maint/25/27
Tender Fee 10000
EMD 23.3 Lakh
Tender Value -
Place NHAI RO NAGPUR
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=294476

Start Date November 15, 2025 15:00
End Date
Expired 15/12/2025

Expired 285 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Construction of vups at km317.400 (sahjapur junction) on aurangabad-karodi-nh-52 and at km349.350 (galle borgaon bypass), km366.250 ( of kannad bypass) and km371.454 (end of kannad bypass)on karodi-telwadi section-nh-52 in maharashtra state-epc

Construction of vups at km317.400 (sahjapur junction) on aurangabad-karodi-nh-52 and at km349.350 (galle borgaon bypass), km366.250 ( of kannad bypass) and km371.454 (end of kannad bypass)on karodi-telwadi section-nh-52 in maharashtra state-epc

Read more
Short term oandm work of 4/6 lanning of karodi (km 320.104) to telwadi (km 375.000) road of nh-211 (new nh no. 52) (existing length 54.896 km design length 55.610 km) in the state of maharashtra under nhdp phase iv-b on item rate (percentage) basis

Short term oandm work of 4/6 lanning of karodi (km 320.104) to telwadi (km 375.000) road of nh-211 (new nh no. 52) (existing length 54.896 km design length 55.610 km) in the state of maharashtra under nhdp phase iv-b on item rate (percentage) basis

Read more
Landslide treatment work of 12 location on nh-58 from km 235.420 (shivpuri) to km 266.130 (kodiyata) under epc mode in the state of uttarakhand on epc mode.

Landslide treatment work of 12 location on nh-58 from km 235.420 (shivpuri) to km 266.130 (kodiyata) under epc mode in the state of uttarakhand on epc mode.

Read more
One time improvement in mehunbare town from km 415.940 to 419.940 and gartad from km 450.840 to 454.140 on nh-52 in the state of maharashtra on epc mode

One time improvement in mehunbare town from km 415.940 to 419.940 and gartad from km 450.840 to 454.140 on nh-52 in the state of maharashtra on epc mode

Read more
Const of slope protection work at various locations on the hillside between km 106.139 to km 129.050 of the solan kaithlighat sec of nh 22 on epc mode in hp on epc mode

Const of slope protection work at various locations on the hillside between km 106.139 to km 129.050 of the solan kaithlighat sec of nh 22 on epc mode in hp on epc mode

Read more
Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.

Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise