Tender Details

Particulars Details
Title
Crate Work And Drsm Work In Co. No. 23a/N Kurta Block Of North Range Under Campa (Npv) 2025 26
Description
Crate Work And Drsm Work In Co. No. 23a/N Kurta Block Of North Range Under Campa (Npv) 2025 26
Organisation FOREST DEPARTMENT | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 600
EMD 10072
Tender Value
Place Co. No. 23a/N Kurta Block of North Range
Link

AAAAAAAAAA

Login to view
Start Date June 17, 2025 20:00
End Date

24/06/2025 ( 2 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Read more
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1

Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Emergent restoration of superstructure and foundation of gairganda bridge including protection work at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase- ii

Emergent restoration of superstructure and foundation of gairganda bridge including protection work at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase- ii

Read more
Emergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i

Emergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise