Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Work Of Nh 01 From Km 24.32 To Km 33.76 And Km 47.02 To 56.72 On Sbu Road Under Project Beacon In The Ut Of Jammu And Kashmir Through Epc Mode
|
| Description |
Strengthening Work Of Nh 01 From Km 24.32 To Km 33.76 And Km 47.02 To 56.72 On Sbu Road Under Project Beacon In The Ut Of Jammu And Kashmir Through Epc Mode
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2023_MoRTH_784861_1 |
|
Reference Number |
- |
| Tender Fee | 11800 |
| EMD | 30.82 Lakh |
| Tender Value | - |
| Place | NH 01 FROM KM 24.32 TO 33.76 KM47.02 TO KM56.72 |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=825058 |
| Start Date | December 24, 2023 17:30 |
| End Date |
Expired
09/02/2024
Expired 975 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreDesign, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Design, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Read moreMunicipal corporation bhagalpur. invites tender for selection of agency for setting-up of 40 capacity processing and recycling facility for construction and demolition waste in municipal corporation bhagalpur through ppp mode,
Municipal corporation bhagalpur. invites tender for selection of agency for setting-up of 40 capacity processing and recycling facility for construction and demolition waste in municipal corporation bhagalpur through ppp mode,
Read moreDesign, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Read moreConstruction of a pcc road and drain extending from the jamadar tola government school (within the bettiah municipal corporation area), passing through the lands of hamid miyan, haji sahab, and salauddin, up to nh-727.
Construction of a pcc road and drain extending from the jamadar tola government school (within the bettiah municipal corporation area), passing through the lands of hamid miyan, haji sahab, and salauddin, up to nh-727.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreStrengthening work of nh 444 from km 186.61 to km 220.70 on under project beacon in the ut of jammu and kashmir through epc mode
Strengthening work of nh 444 from km 186.61 to km 220.70 on under project beacon in the ut of jammu and and kashmir through epc mode
Read moreStrengthening work of nh 444 from km 186.61 to km 220.70 on under project beacon in the ut of jammu and kashmir through epc mode
Strengthening work of nh 444 from km 186.61 to km 220.70 on under project beacon in the ut of jammu and kashmir through epc mode
Read moreRehabilitation of nh 01 with ilcb between km 95.00 to 100.841 under 122 rcc project beacon in ut jammu kashmir on epc mode
Rehabilitation of nh 01 with ilcb between km 95.00 to 100.841 under 122 rcc project beacon in ut jammu kashmir on epc mode
Read moreof your Industry type