Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pinion Shaft Sub Assy Gb H2 Sh 06 Flender,Pinion Shaft Sub Assy Gb H2 Sh 10 Flender,Pinion Shaft Sub
|
| Description |
|
| Organisation | Steel Authority of India Limited | Ministry of Steel |
| Tender Id | GEM/2024/B/5127918 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 10, 2024 00:10 |
| End Date |
Expired
19/07/2024
Expired 688 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | SNC COMMERCIAL | - | 16-08-2024 16:59:01 | MII MSE | Qualified |
Armo electrical mechanical services sub station generator set lift fire alarm down comer system vrv air conditioning system in income tax office building at kurukshetra during 2026-27 sh outsourcing of electrical services
Read morePed-10/2026-27
Tender for prov. skilled labour aw t and p during major breakdowns due to hailstorm, rainfall for electrical sub division no. ii under electrical division, hpsebl palampur.
Read moreRoad, nali, drain, cross and various repair work ward 06 to 10 at nagarplika jhalrapatan dist jhalawar
Road, nali, drain, cross and various repair work ward 06 to 10 at nagarplika jhalrapatan dist jhalawar
Read more06/ee(civil)puducherry-i/cpwd/2026-27(r1)
Construction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply lines, sanitary installation, drainage, de,olition of existing quarters other development works. (electrical and mechanical installation): package c1: providng internal e1, c2: providing fire alarm system, c3: providing firefighting system, c4: providing 5000 lpd solar water heater , c7: providing networking, (agreement no. 32/ee(puducherry)/cpwd/2023-24) sub head: risk cost under clause 14 for execution of masonry work, finishing work, sanitary installations and fittings, water supply installations and fittings drainage and water proofing work treatment in sunken flooring.
Read moreDay to day prive maintenance of entire ei for sub stan., both non-residential and residential bld, compound light incl operation of all dg set (existing and upcoming all ei) in the premises of lady duffrin victoria hospital, kol, under mchesd
Read moreSupply installation testing and commissioning of 10 meter oct pole mini mast with 06 nos of 150w led flood lights near haq mithilaj memorial kalungin mukham
Supply installation testing and commissioning of 10 meter oct pole mini mast with 06 nos of 150w led flood lights near haq mithilaj memorial kalungin mukham
Read moreConstruction of 2.5 mgd sps on dbo basis 10 years onm and providing and laying 400 mm nominal dia rising main from sultanpur sps to ghitorni wwtp under chhattarpur assembly constituency, south delhi nit-06
Nit. no. 06(2026-27)/ee(c)dr-vi
Read moreOperation maintenance and watch and ward of toilet at sukhna lake regulatory end under sde water supply sub division no. 2, chandigarh (period 01.06.2026 to 31.03.2027 ) (10 months) (ch. to 2216 n.p mtc. and repair
Operation maintenance and watch and ward of toilet at sukhna lake regulatory end under sde water supply sub division no. 2, chandigarh (period 01.06.2026 to 31.03.2027 ) (10 months) (ch. to 2216 n.p mtc. and repair
Read moreof your Industry type