Tender Details
Particulars | Details |
---|---|
Title |
Construction Of High Security Jail Complex At Narela, Delhi (Sh Construction Of Ward Block, Control Room And Dispensary, Langar With Mess Staff, Administration Block, 3 Nos. R.C.C. Boundary Wall, 8 Nos Watch Towers, 8 Nos Rcc And Steel Entry Gate
|
Description |
Construction Of High Security Jail Complex At Narela, Delhi (Sh Construction Of Ward Block, Control Room And Dispensary, Langar With Mess Staff, Administration Block, 3 Nos. R.C.C. Boundary Wall, 8 Nos Watch Towers, 8 Nos Rcc And Steel Entry Gate
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1.5 Crore |
Tender Value | |
Place | work |
Link |
AAAAAAAAAA Login to view |
Start Date | May 06, 2025 00:25 |
End Date |
27/05/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of high security jail complex at narela, delhi (sh- construction of ward block, control room and dispensary, langar with mess staff, administration block, 3 nos. r.c.c. boundary wall, 8 nos watch towers, 8 nos rcc and steel entry gate
Construction of high security jail complex at narela, delhi (sh- construction of ward block, control room and dispensary, langar with mess staff, administration block, 3 nos. r.c.c. boundary wall, 8 nos watch towers, 8 nos rcc and steel entry gate
Read moreEor to ggsss harkesh nagar (school id 1925341), new delhi during 2024-25 (sh construction of boundary wall and guard room, granite flooring in corridor, repair/renovation work in principal room and stainless steel main gate) (balance work).
Eor to ggsss harkesh nagar (school id 1925341), new delhi during 2024-25 (sh construction of boundary wall and guard room, granite flooring in corridor, repair/renovation work in principal room and stainless steel main gate) (balance work).
Read more54(niq)/ae-iii/cpwd/2024/513 dated 27.09.2024
Re-construction of boundary wall from block chowk to towards boys hostel (950 mtr length) from patra toli to towards n2 quarter (850 mtr. length) and gate complex (5 nos.) for the campus of cip kanke ranchi sh: structural design drawing for boundary wall (total length 1800 mtr.) (05 nos. gate) century room, guard room, toilet, wicket gate and rcc retaining wall for the campus of cip kanke ranchi
Read moreRetaining wall, boundary wall, main plant gate complex including cisf building, safety control room, main plant roads, drains, road crossings and watch towers at 2x800mw singrauli stpp stage-iii
Retaining wall, patrol road and pre-cast / cast-in-situ rcc panels boundary wall, main plant gate complex including cisf building, safety control room, main plant roads, drains, road crossings and watch towers at 2x800mw singrauli stpp stage-iii
Read moreE.o.r to sarvodaya kanya vidyalaya anand vihar delhi during 2021 22.sh upgradation of existing toilets 8 nos. and guard toilet. sw construction of guard room toilet aluminium door and channel gate.
E.o.r to sarvodaya kanya vidyalaya anand vihar delhi during 2021 22.sh upgradation of existing toilets 8 nos. and guard toilet. sw construction of guard room toilet aluminium door and channel gate.
Read moreEor to ggsss harkesh nagar school (school id- 1925341), new delhi during 2023-24. (sh construction of boundary wall and guard room, granite flooring in corridor, repair and renovation work in principal room and stainless steel main gate of school)
Eor to ggsss harkesh nagar school (school id- 1925341), new delhi during 2023-24. (sh construction of boundary wall and guard room, granite flooring in corridor, repair and renovation work in principal room and stainless steel main gate of school)
Read moreEor to central jail no.1, tihar, new delhi sh- construction of three new room i.e. search room, video conference, physiotherapy room and construction of new boundary wall for separation of block a and block b in ward no.1 and repair of existing bound
Eor to central jail no.1, tihar, new delhi sh- construction of three new room i.e. search room, video conference, physiotherapy room and construction of new boundary wall for separation of block a and block b in ward no.1 and repair of existing bound
Read moreConstruction boundary wall of bldg. no p-57 ds cell provn rcc framed in place of collapsed brick security wall around (deal house), provn of 08 nos pedestal fan entry/exit points near gate no 2, 3, 4 ,5 in technical area at irde ge (i) rnd dehradun
Construction boundary wall of bldg. no p-57 ds cell provn rcc framed in place of collapsed brick security wall around (deal house), provn of 08 nos pedestal fan entry/exit points near gate no 2, 3, 4 ,5 in technical area at irde ge (i) rnd dehradun
Read moreof your Industry type