Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Manufacturing & Supply Of Adopter Rod For Bcb Assembly On 105 Ifg Carriage
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5422865 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 21, 2024 15:20 |
| End Date |
Expired
12/10/2024
Expired 604 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | Indo German tool room | Make : OEM Model : ADOPTER ROD FOR BCB ASSEMBLY ON 105 IFG CARRIAGE Title : Manufacturing & Supply of Adopter Rod for BCB Assembly on 105 IFG Carriage | 11-10-2024 14:26:39 | MSE | Qualified |
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | Indo German tool room(MSE)( MSE Social Category:General ) | Item Categories : Manufacturing & Supply of Adopter Rod for BCB Assembly on 105 IFG Carriage | 145022.00 | L1 |
Supply of beacon housing welded assembly for sonar beacon project
Supply of beacon housing welded assembly for sonar beacon project
Read moreExpression of interest for supply of a continuous fiber fabrication (cff) enabled additive manufacturing system for defence applications
Expression of interest for supply of a continuous fiber fabrication (cff) enabled additive manufacturing system for defence applications
Read moreTender for running contract for manufacturing and supply of cms crossing 60 kg 1 in 12 to drg. no.t-4220
For complete deion and other details, please refer to tender
Read more04 labour contract for manufacturing of steel rack of various sizes
Labour contract for manufacturing of steel rack of various sizes
Read moreManufacturing, supply and laying of rcc cable trough for orr and airport line (new line) of phase-2a and phase-2b.
Manufacturing, supply and laying of rcc cable trough for orr and airport line (new line) of phase-2a and phase-2b.
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Development of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Read moreEngagement ofcommercial vehicle with labour for carriage of damage transformer under edd- ii baraut
Engagement ofcommercial vehicle with labour for carriage of damage transformer under edd- ii baraut
Read moreStrengthening of road (p/l bitumen mastic wearing course on mahamaya flyover on delhi to noida carriage way, mahamaya flyover clover leaf sec-44 and sec-37 side and patch work on mp3 road) noida
Strengthening of road (p/l bitumen mastic wearing course on mahamaya flyover on delhi to noida carriage way, mahamaya flyover clover leaf sec-44 and sec-37 side and patch work on mp3 road) noida
Read moreConstruction of bridge, approach road, protection work on the tedhi river at veersinghpur, under the tarabganj assembly constituency in disrict gonda on sbd mode
Construction of bridge, approach road, protection work on the tedhi river at veersinghpur, under the tarabganj assembly constituency in disrict gonda on sbd mode
Read moreof your Industry type