Tender Details

Particulars Details
Title
1700009649 Carrier Roller 1200 Mm Bw,1700009650 Carrier Roller 1050 Mm Bw,1700009651 Carrier Roller 1
Description
Organisation NMDC Limited | Ministry of Steel
Tender Id GEM/2025/B/6271934
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date May 25, 2025 17:26
End Date
Expired 10/06/2025

Expired 488 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Buyer Name: Vinay Saini
Ministry: Ministry Of Steel
Department: Nmdc Limited
Organisation: Nmdc Limited
Similar Tenders
Procurment of spare wheel carrier

Procurment of spare wheel carrier

Read more
Supply of double row spherical roller bearings for use at rchp, kothagudem area

Supply of double row spherical roller bearings for use at rchp, kothagudem area

Read more
Procurement of spherical roller bearing (23040cck/w33 ) for use at jvrchp, sathupally area.

Procurement of spherical roller bearing (23040cck/w33 ) for use at jvrchp, sathupally area.

Read more
Supply of spherical roller pillow block for paddle feeder s at silo of ash handling system

Supply of spherical roller pillow block for paddle feeder s at silo of ash handling system

Read more
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise