Tender Details

Particulars Details
Title
Supply Of Wafer Type Hand Operated Butterfly Valves With Heavy Duty Worm Gear Assembly For Sea Water Booster Pump Of Unit 1 2 And 3
Description
Supply Of Wafer Type Hand Operated Butterfly Valves With Heavy Duty Worm Gear Assembly For Sea Water Booster Pump Of Unit 1 2 And 3
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_522097_1
Reference
Number
CE/TTPS/3694-S
Tender Fee 0
EMD 10300
Tender Value
Place CE/TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=621423
Start Date February 01, 2025 14:30
End Date

24/02/2025 ( Expired 57 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Internal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)

Internal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)

Read more
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.

Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.

Read more
Procurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia

Procurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia

Read more
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur

Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur

Read more
Internal improvement works of cluster section no. s-376 (package-3) for water supply schemes 1. kawan wali 2. chak rohella 3. mahatam nagar 4. hasta kalan 5. nawan hasta 6. jhanger bhaini (rette wali bhaini) block and distt. fazilka

Providing, stringing out pvc pipes , household connections, water meter, disinfection unit, painting installation of sign board etc. complete in all respect and all other works contgent there to. (under state share/jjm)

Read more
Supply of safety relief valves for both boiler feed pumps of model no:fk4e36 and booster pumps of model no:fa1b75 of 1 x500mw

Supply of safety relief valves for both boiler feed pumps of model no: fk4e36 and booster pumps of model no: fa1b75 of 1x500mw unit

Read more
Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.

Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.

Read more
Supply, delivery, erection, testing and commissioning of wall mounted, 5 star, bee rating, inverter type split ac machines having capacity 48 nos x 2 tr for replacement of existing ac machine.condenser and evaporator unit of the stated ac machine

Supply, delivery, erection, testing and commissioning of wall mounted, 5 star, bee rating, inverter type split ac machines having capacity 48 nos x 2 tr for replacement of existing ac machine.condenser and evaporator unit of the stated ac machine&amp#x0d &amp#x0d

Read more
Supply and installation work of water cooler and sumbersible pump (h.p.) safety cover with platform. (line 1)

Supply and installation work of water cooler and sumbersible pump (h.p.) safety cover with platform.

Read more
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap (6) cylinder with brass line

Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap&amp#x0d (6) cylinder with brass line

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise