Tender Details
Particulars | Details |
---|---|
Title |
Environmental Clearance Work Of Seep Ambar Irrigation Complex Project Phase Ii From Mp State Environment Impact Assessment Authority (Mpseiaa) (Second Call)
|
Description |
Environmental Clearance Work Of Seep Ambar Irrigation Complex Project Phase Ii From Mp State Environment Impact Assessment Authority (Mpseiaa) (Second Call)
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_WRD_311448_1 |
Reference Number |
2023_WRD_311448 |
Tender Fee | 2000 |
EMD | 20000 |
Tender Value | |
Place | W.R. Division Sehore |
Link | https://mptenders.gov.in |
Start Date | December 13, 2023 16:00 |
End Date |
20/12/2023 ( Expired 511 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of a consultant for obtaining environmental clearance and conducting the environmental impact assessment study for the proposed industrial complex in velloor, kottayam for kerala rubber limited -second call.
Selection of a consultant for obtaining environmental clearance&#x0d and conducting the environmental impact assessment study for&#x0d the proposed industrial complex in velloor, kottayam for kerala&#x0d rubber limited -second call.&#x0d
Read moreConstruction of foot over bridge with ramp for four laning work from hiran river to sindoor river from km 66.000 to km. 130.000 section of nh 45 under nhdp phase ii in the state of mp
Construction of foot over bridge with ramp for four laning work from hiran river to sindoor river from km 66.000 to km. 130.000 section of nh 45 under nhdp phase ii in the state of mp
Read moreRestoration of bituminous and concrete road by damage due to laying of di, opvc and hdpe pipe line of zone viii sirishdanga proposed ohr under amrut 2.0 (phase ii) within asansol municipal corporation.3rd call
Restoration of bituminous and concrete&#x0d road by damage due to laying of di, opvc&#x0d and hdpe pipe line of zone viii&#x0d sirishdanga proposed ohr under amrut&#x0d 2.0 (phase ii) within asansol municipal&#x0d corporation.3rd call
Read moreRd 30000 to 45000 of flood protection bandh rd 0 to 110920 of river sutlej in muthianwala complex
Widening and strengthening from rd 30000 to 45000 of flood protection bandh rd 0 to 110920 of river&#x0d sutlej in muthianwala complex.
Read moreWork including garbage collection and separation from every house (residential and commercial), road and drain cleaning and community sanitation complex cleaning in all the villages of gram panchayat salempur
Work including garbage collection and separation from every house (residential and commercial), road and drain cleaning and community sanitation complex cleaning in all the villages of gram panchayat salempur
Read moreClearance of muck, slush from canal syphon in reach rd 20335 to 35530 mtr of kandi canal stage i
Clearance of muck, slush from canal syphon in reach rd 20335 to 35530 mtr of kandi canal stage i
Read moreConstruction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from medpally (design km. 65.000) to jagtiyal (design km. 93.700) (total length 28.700 km) under nh(o) on ham in the state of telangana (pkg-ii)
Construction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from medpally (design km. 65.000) to jagtiyal (design km. 93.700) (total length 28.700 km) under nh(o) on ham in the state of telangana (pkg-ii)
Read moreConstruction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from rayapatnam (design km. 125.600) to mancherial (design km. 160.995) (total length 35.395 km) under nh(o) on ham in the state of telangana (pkg-iv)
Construction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from rayapatnam (design km. 125.600) to mancherial (design km. 160.995) (total length 35.395 km) under nh(o) on ham in the state of telangana (pkg-iv)
Read moreRoutine maintenance and incident management of 4-laning of punjab-haryana border-jind section of nh-71 from km 238.695 to km 307.000 (design km. 238.725 to km. 307.000) in the state of haryana (2nd call)
Routine maintenance and incident management of 4-laning of punjab-haryana border-jind section of nh-71 from km 238.695 to km 307.000 (design km. 238.725 to km. 307.000) in the state of haryana (2nd call)
Read morePavement rectification work on existing road of haridwar-dehradun section (pkg-1) at risk and cost of contractor
Pavement rectification work on existing road of haridwar-dehradun section at risk andcost of contractor from haridwar 
 ch.209.100 to ch.216.824 of nh-58 and from ch.188.324 to laltappar ch.181.100 of nh-34 (pkg-1) in state of ukd
Read moreof your Industry type