Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of Pmgsy Handed Over Road (L054, Bishalgarh Block) From Sunam Ganj To Durga Nagar Via Nabi Nagar (L 3km) And Portion From Durganagar To Durganagar Bazar (L 0 Point 70 Km) (Total L 3 Point 70 Km) During The Year 2024 25
|
| Description |
Sh Flat Brick Soling, Edge Soling, Repair Of Pot Holes, Wbm Iii, Carpeting And Re Carpeting, Brick Masonry Work, Road Side Pucca Drain And Other Ancillary Works
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_57182_1 |
|
Reference Number |
136_R_DNIT_SEIV_PWD(RnB)_24_25 |
| Tender Fee | 4000 |
| EMD | 2.69 Lakh |
| Tender Value | |
| Place | Bishalgarh |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=64839 |
| Start Date | July 14, 2025 22:00 |
| End Date |
Expired
08/08/2025
Expired 303 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fdr to pmgsy handed over road from sarkar tila to champamura bazar (l_ 4 point 30 km) during the year 2024_25_sh_patch repairing, patch metalling, carpeting, recarpeting, soling, protection work, pucca drain and other ancillary works
Fdr to pmgsy handed over road from sarkar tila to champamura bazar (l_ 4 point 30 km) during the year 2024_25_sh_patch repairing, patch metalling, carpeting, recarpeting, soling, protection work, pucca drain and other ancillary works
Read moreMaintenance of water logged portion of different roads under bishalgarh municipal council area left side of agartala_udaipur _sabroom road total l_ 0 point 525 km during the year 2024_25 group_ii_sh paver block, flat brick soling, wbm_ii, wbm_iii, br
Maintenance of water logged portion of different roads under bishalgarh municipal council area left side of agartala_udaipur _sabroom road total l_ 0 point 525 km during the year 2024_25 group_ii_sh paver block, flat brick soling, wbm_ii, wbm_iii,
Read moreMaintenance of road from office tilla to lockdown market length 1 point 10 km / portion from office tilla to namapara ch 0 point 00 km to ch 0 point 70 km length 0 point 70 km and nh-08 to office tilla school via manu paul house length 0 point 30
Maintenance of road from office tilla to lockdown market length 1 point 10 km / portion from office tilla to namapara ch 0 point 00 km to ch 0 point 70 km length 0 point 70 km and nh-08 to office tilla school via manu paul house length 0 point 30
Read moreFdr to the pwd road from chowmuhani bazar to surjyamaninagar elect sub-station (l_3 point 70 km) under amtali pwd (rnb) sub division during the year 2025_26
Sh_patch repairing, patch metalling, carpeting, premix seal coat and other allied works (portion from ch 1 point 40 km to 2 point 50 km).
Read moreFlood damage repairs to the road from bdv road (laskar chowmuhani) to k k nagar (length_2 point 10 km) and road from durganagar to duganagi (length_0 point 60 km) under bishalgarh rd block during the year 2024_25_sh_ soling, wbm-ii, wbm-iii, carpetin
Flood damage repairs to the road from bdv road (laskar chowmuhani) to k k nagar (length_2 point 10 km) and road from durganagar to duganagi (length_0 point 60 km) under bishalgarh rd block during the year 2024_25_sh_ soling, wbm-ii, wbm-iii, carpetin
Read moreMaintenance of road from nh-08 at bazar india to murabari length 2 point 10 km / portion from bazar india to rail bridge from ch 0 point 00 km to ch 1 point 10 km length 1 point 10 km and office tilla horticulture godown to bazar india to murabari
Maintenance of road from nh-08 at bazar india to murabari length 2 point 10 km / portion from bazar india to rail bridge from ch 0 point 00 km to ch 1 point 10 km length 1 point 10 km and office tilla horticulture godown to bazar india to murabari
Read morePr of road from pecharthal kanchanpur road to pecharthal kanchanpur road via kshirodcherra during the year 2023 2024 total length 0 point 900 km sh mettaling carpeting and seal coat work from ch 0 point 00 km to 0 point 450 km gr 1
Pr of road from pecharthal kanchanpur road to pecharthal kanchanpur road via kshirodcherra during the year 2023 2024 total length 0 point 900 km sh mettaling carpeting and seal coat work from ch 0 point 00 km to 0 point 450 km gr 1
Read morePr of road from pecharthal kanchanpur road to pecharthal kanchanpur road via kshirodcherra during the year 2023 2024 total length 0 point 900 km sh mettaling carpeting and seal coat work from ch 0 point 450 km to 0 point 900 km gr 2
Pr of road from pecharthal kanchanpur road to pecharthal kanchanpur road via kshirodcherra during the year 2023 2024 total length 0 point 900 km sh mettaling carpeting and seal coat work from ch 0 point 450 km to 0 point 900 km gr 2
Read moreFdr to the pwd road from kanchanmala bazar (shyamtoli) to kanchanmala hospital (l_1 point 50 km) under amtali pwd (rnb) sub division during the year 2024_25_sh wbm, patch repairing, carpeting (portion from ch 0 to ch 0 point 60 km)_gr_i
Fdr to the pwd road from kanchanmala bazar (shyamtoli) to kanchanmala hospital (l_1 point 50 km) under amtali pwd (rnb) sub division during the year 2024_25_sh wbm, patch repairing, carpeting (portion from ch 0 to ch 0 point 60 km)_gr_i
Read moreMaintenance of pmgsy handed over road from purathal to husen sardar para ghosh para l0-61 length 1 point 28 km under bishalgarh ac during the year 2024-25 / sh- patch repairing patch metalling carpeting re-carpeting soling protection work pucca dra
Maintenance of pmgsy handed over road from purathal to husen sardar para ghosh para l0-61 length 1 point 28 km under bishalgarh ac during the year 2024-25 / sh- patch repairing patch metalling carpeting re-carpeting soling protection work pucca dra
Read moreof your Industry type