Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Footpath From Northern Side Of Gymkhana To The Main Gate Of 2nd Campus, Rims, Imphal.
|
Description |
Construction Of Footpath From Northern Side Of Gymkhana To The Main Gate Of 2nd Campus, Rims, Imphal.
|
Organisation | Regional Institute of Medical Sciences | Central Govt. Ministry/Department |
Tender Id | 2025_RIMS_844328_1 |
Reference Number |
72/2024-25/RIMS/Imphal |
Tender Fee | 1000 |
EMD | 1.63 Lakh |
Tender Value | |
Place | As Per Tender Document |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=887503 |
Start Date | January 14, 2025 14:30 |
End Date |
24/01/2025 ( Expired 114 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreIe services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Read moreConsultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreConstruction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreof your Industry type