Tender Details
Particulars | Details |
---|---|
Title |
Automatic Milk Collection Unit With Electronic Milk Analyzer And Adulteration Testing
|
Description |
|
Organisation | Animal Husbandry and Fisheries Department Telangana | |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 22, 2025 01:29 |
End Date |
06/05/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read moreSupply installation, testing and commissioning of 3 tesla magnetic resonance imaging (mri) machine with 05 years warranty.
Supply installation, testing and commissioning of 3 tesla magnetic resonance imaging (mri) machine with 05 years warranty.
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Read moreBiennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Read moreDesign, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Design, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Read moreSelection of bank for issuance and processing of national common mobility card (ncmc) transactions, and integrating with other fare collection systems like afcs for varanasi ropeway project in the state of uttar pradesh
Selection of bank for issuance and processing of national common mobility card (ncmc) transactions, and integrating with other fare collection systems like afcs for varanasi ropeway project in the state of uttar pradesh
Read moreSupply erection testing and commissioning of complete battery bank with buyback of old battery bank installed at dcrtpp
Supply erection testing and commissioning of complete battery bank with buyback of old battery bank installed at dcrtpp
Read moreSupply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreSupply installation testing commissioning of turmeric processing plant 0.5 tph capicity turmeric grading and polishing unit 1 tph
Supply installation testing commissioning of turmeric processing plant 0.5 tph capicity turmeric grading and polishing unit 1 tph
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Read moreof your Industry type