Tender Details

Particulars Details
Title
Strengthening Of Street Light With Low Height Pole In Sector 14, Noida
Description
Strengthening Of Street Light With Low Height Pole In Sector 14, Noida
Organisation New Okla Industrial Development Authority | State Govt. and UT
Tender Id 2024_NOIDA_882470_1
Reference
Number
44/DGM(E/M)/SM.(E and M)-III/2023-24
Tender Fee 5310
EMD 2.67 Lakh
Tender Value
Place Noida
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1509017

Start Date January 19, 2024 14:30
End Date
Expired 25/01/2024

Expired 908 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Providing street light with low height pole at dsc road under metro track from sector 14 to sector 18, noida

Providing street light with low height pole at dsc road under metro track from sector 14 to sector 18, noida

Read more
Providing low height decorative street light pole in main road at sector-17 , noida

Providing low height decorative street light pole in main road at sector-17 , noida

Read more
Providing low height decorative street light pole on main road in sector -100, noida

Providing low height decorative street light pole on main road in sector -100, noida

Read more
Strengthening of street light with low height pole at sector 96 and 98 service road, noida (dark spot identified by police)

Strengthening of street light with low height pole at sector 96 and 98 service road, noida (dark spot identified by police)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise