Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of Street Light With Low Height Pole In Sector 14, Noida
|
| Description |
Strengthening Of Street Light With Low Height Pole In Sector 14, Noida
|
| Organisation | New Okla Industrial Development Authority | State Govt. and UT |
| Tender Id | 2024_NOIDA_882470_1 |
|
Reference Number |
44/DGM(E/M)/SM.(E and M)-III/2023-24 |
| Tender Fee | 5310 |
| EMD | 2.67 Lakh |
| Tender Value | |
| Place | Noida |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1509017 |
| Start Date | January 19, 2024 14:30 |
| End Date |
Expired
25/01/2024
Expired 908 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreProviding street light with low height pole at dsc road under metro track from sector 14 to sector 18, noida
Providing street light with low height pole at dsc road under metro track from sector 14 to sector 18, noida
Read moreProviding low height decorative street light pole in main road at sector-17 , noida
Providing low height decorative street light pole in main road at sector-17 , noida
Read moreProviding low height decorative street light pole on main road in sector -100, noida
Providing low height decorative street light pole on main road in sector -100, noida
Read moreStrengthening of street light with low height pole at sector 96 and 98 service road, noida (dark spot identified by police)
Strengthening of street light with low height pole at sector 96 and 98 service road, noida (dark spot identified by police)
Read moreof your Industry type