Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constructing New V.R.B. At Km. 7.200 Of Bhagautapur Mr.
|
| Description |
Constructing New V.R.B. At Km. 7.200 Of Bhagautapur Mr.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPIDC_845292_37 |
|
Reference Number |
01/EE/2023-24 |
| Tender Fee | 766 |
| EMD | 20000 |
| Tender Value | - |
| Place | SARYU NAHAR KHAND-4, BALRAMPUR |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | October 04, 2023 15:30 |
| End Date |
Expired
18/10/2023
Expired 1089 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of the road and drain on the route in ward no. 21 leading from mr. anil kumar's house towards mr. mukesh's house, passing via mr. brijesh's house.
Construction of the road and drain on the route in ward no. 21 leading from mr. anil kumar's house towards mr. mukesh's house, passing via mr. brijesh's house.
Read moreRoad construction work in ward no. 09 of bettiah municipal corporation—spanning the route from the residence of mr. ashutosh barnwal, passing by the residence of mr. manoj barnwal, and extending to the residence of mr. dayasagar teli at gas lal chowk—along with the construction of a culvert near the residence of mr. pradeep barnwal at purani gudri.
Road construction work in ward no. 09 of bettiah municipal corporation—spanning the route from the residence of mr. ashutosh barnwal, passing by the residence of mr. manoj barnwal, and extending to the residence of mr. dayasagar teli at gas lal chowk—along with the construction of a culvert near the residence of mr. pradeep barnwal at purani gudri.
Read moreConstruction of an rcc drain and pcc paving in ward no. 26, extending from in front of mr. samant tiwari's house to in front of mr. sugriv prasad's house.
Construction of an rcc drain and pcc paving in ward no. 26, extending from in front of mr. samant tiwari's house to in front of mr. sugriv prasad's house.
Read moreRemodelling of existing damaged section drain by constructing box drain from h no 11-3-558 to sheethal cafe under mallepally division- 147, masabtank circle-34, gz, ghmc.
Remodelling of existing damaged section drain by constructing box drain from h no 11-3-558 to sheethal cafe under mallepally division- 147, masabtank circle-34, gz, ghmc.
Read moreDesign, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s
Design, build, construct, install and commissioning of material recovery facility (mr f) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 year s
Read moreRaising and improvement of the major district road connecting arabhavichallakere state highway45 to shingalapur thakke lolasur basaligundi nallanatti balobal biranagaddi and hunashyal p.g. to join sankeshwar sangam state highway 44 near vaderahatti, from km 5.00 to km 6.25 and constructing a bridge at km 5.86 near lolasur ingokak taluk of belagavi district.
Raising and improvement of the major district road connecting arabhavichallakere state highway45 to shingalapur thakke lolasur basaligundi nallanatti balobal biranagaddi and hunashyal p.g. to join sankeshwar sangam state highway 44 near vaderahatti, from km 5.00 to km 6.25 and constructing a bridge at km 5.86 near lolasur ingokak taluk of belagavi district.
Read moreManjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Manjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Read moreConstructing new v.r.b. at km. 7.200 of bhagautapur mr.
Constructing new v.r.b. at km. 7.200 of bhagautapur mr.
Read moreConstructing new v.r.b. at km. 5.750 of bhagautapur mr.
Constructing new v.r.b. at km. 5.750 of bhagautapur mr.
Read moreConstructing new v.r.b. at km. 2.680 of bhagautapur mr.
Constructing new v.r.b. at km. 2.680 of bhagautapur mr.
Read moreof your Industry type