Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Monitoring And Verification Of Various Units/Plants Of Saputra Thermal Power Station (2 X250 Mw), Sarni As Per The Bee Pat Scheme For Pat Cycle Vii (2022 25).
|
| Description |
Complete Monitoring &Amp#X0d
And Verification Of Various &Amp#X0d
Units/Plants Of Saputra &Amp#X0d
Thermal Power Station &Amp#X0d
(2 X250 Mw), Sarni As &Amp#X0d
Per The Bee Pat &Amp#X0d
Scheme For Pat Cycle&Amp#X0d
Vii (2022 25).
|
| Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
| Tender Id | 2025_MPPGC_422071_1 |
|
Reference Number |
WT-4911 |
| Tender Fee | 295 |
| EMD | 5900 |
| Tender Value | |
| Place | works |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=497671 |
| Start Date | May 09, 2025 22:30 |
| End Date |
Expired
14/05/2025
Expired 407 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ioh kit for valve model no. 3403-25-sb of rotex make as per rotex part no. 11zp25sb06003. make - rotex.
For complete deion and other details, please refer to tender
Read moreRegulated dc power supply unit of out put voltage 0-120vdc ,out put current is 0-25adc min. the technical specifications are as per enclosed annexure.
For complete deion and other details, please refer to tender
Read moreMonitoring and verification (mv) assessment 2024-25 of lakwa thermal power station in compliance with perform achieve and trade (pat) scheme for the pat cycle vii 2022-23 to 2024-25.
Monitoring and verification (mv) assessment 2024-25 of lakwa thermal power station in compliance with perform achieve and trade (pat) scheme for the pat cycle vii 2022-23 to 2024-25.
Read moreWork contract for complete monitoring and verification audit of sgtps,mppgcl, birsinghpur 4x210 mw 1x 500 mw as per the pat scheme bee for pat cyclevii 2022-25
Work contract for complete monitoring and verification audit of sgtps,mppgcl, birsinghpur 4x210 mw 1x 500 mw as per the pat scheme bee for pat cyclevii 2022-25
Read moreMonitoring and verification of rvun power stations for pat vii
Monitoring and verification of rvun power stations for pat vii
Read moreMonitoring and verification of energy audit in kgtps as per energy conservation act 2001 by empanelled accredited energy auditors approved by bee for pat cycle vii
Monitoring and verification of energy audit in kgtps as per energy conservation act 2001 by empanelled accredited energy auditors approved by bee for pat cycle vii
Read moreMonitoring and verification audit on carbon credit trading scheme at cci tandur under pat scheme cycle vii
Monitoring and verification audit on carbon credit trading scheme at cci tandur under pat scheme cycle vii
Read moreConsultancy for filling and verification of form a as well as providing assistance in submission of form b and c, monitoring and verification (m and v) work and other works for obra thermal power project under pat scheme in pat cycle-vii
Consultancy for filling and verification of form a as well as providing assistance in submission of form b and c, monitoring and verification (m and v) work and other works for obra thermal power project under pat scheme in pat cycle-vii
Read moreConsultancy for filling and verification of form a as well as providing assistance in submission of form b and c monitoring and verification m and v work and other works for harduaganj thermal power project under pat scheme in pat cycle vii
Consultancy for filling and verification of form a as well as providing&#x0d assistance in submission of form b and c monitoring and verification m and v&#x0d work and other works for harduaganj thermal power project under pat&#x0d scheme in pat cycle vii&#x0d
Read moreNctps 1 operation circle operation and efficiency dn monitoring and verification audit for pat cycle vii
Nctps 1 operation circle operation and efficiency dn monitoring and verification audit for pat cycle vii
Read moreof your Industry type