Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1. Signalling Arrangement In Connection With Interlocking Of Lc.No. 39 Between Npml Lpjl Of Pdpl Nzb Section On Sc Division.
2. Signalling Arrangement In Connection With Interlocking Of Lc.No. 19 Between Krmr Kphi Of Pdpl Nzb Section On Sc Division.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73132708 |
|
Reference Number |
C_SG_36_483 |
| Tender Fee | 0 |
| EMD | 2.01 Lakh |
| Tender Value | |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73132708/viewNitPdf_4455910.pdf |
| Start Date | January 23, 2024 20:55 |
| End Date |
Expired
14/02/2024
Expired 859 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read morePdpl-nzb section: sw 1) proposed safety related track works from km: 0.00 to 92.00 on single line between pdpl-lpjl stations in sse/p.way/krmr section under aden/krmr sub division sw 2) proposed miscellaneous track works (other than safety related track items) from km: 0.00 to 92.00 on single line between pdpl-lpjl stations in sse /p.way/krmr section under aden/krmr sub division.
For complete deion and other details, please refer to tender
Read moreSc division: 1. provision towards trd modification at lc no.2 between dkj-pcz of dkj-mugr section on sc division. 2. provision towards trd modification at lc no.4 between kra-pcz of dkj-mugr section on sc division. 3.provision towards trd modification at lc no.39 between npml-lpjl of pdpl-nzb section on sc division. 4.provision towards trd modification at lc no.19 between krmr-kphi of pdpl-nzb section on sc division.
For complete deion and other details, please refer to tender
Read morePdpl-nzb section: sw 1) proposed safety related track works from km: 92 to 177.78 on single line between lpjl-nzb stations in sse/p.way/armu section under aden/krmr sub division sw 2) proposed miscellaneous track works (other than safety related track items) from km: 92 to 177.78 on single line between lpjl-nzb stations in sse/p.way /armu section under aden/krmr sub division.
For complete deion and other details, please refer to tender
Read morePdpl-lpjl section: sw 1) proposed estimation for manual deep screening at isolated locations at major bridge, lc gate, stbd yard gl-1, 2, krmr yards (road-4, road-5), gdra loop-2, lpjl jumbo siding of pdpl-lpjl section in sse/p.way/krmr section under aden/krmr sub-division.
For complete deion and other details, please refer to tender
Read more1. signalling arrangement in connection with interlocking of lc.no. 2 mb between dkj-pcz of dkj-mugr section on sc division. 2.signalling arrangement in connection with interlocking of lc.no. 4 mb between kra - pcz of dkj-mugr section on sc division.
For complete deion and other details, please refer to tender
Read moreSecunderabad division- electrical maintenance department - secunderabad division electrical maintenance department - schedule a - (i) signalling arrangement in connection with interlocking of lc no.2mb between dkj-pcz of dkj-mugr section (ii) signalling arrangement in connection with interlocking of lc no.4mb between kra-pcz of dkj-mugr section (iii) signalling arrangement in connection with interlocking of lc no 39 between npml-lpjl of pgpl-nzb section (iv) signalling arrangement in connectio
For complete deion and other details, please refer to tender
Read morePdpl-nzb section: -proposed construction of ancillary works of drainage arrangement and providing long speed brakers duly extending retaining wall and road surface at rub nos. 1) 11a between pdpl-stbd stations, 2) 16a between pdpl-stbd stations, 3) 26 between pdpl-stbd stations, 4) 101 between stbd-krmr stations, 5) 123a between stbd-krmr stations, 6) 134 between stbd-krmr stations and 7) 140a between stbd-krmr stations, under aden/krmr sub-division between peddapalli-nizamabad stations.
For complete deion and other details, please refer to tender
Read moreof your Industry type