Title |
Supply Erection And Commissioning Of 400 Kv Dc Line From Udangudi Switchyard To Samugarengapuram 400 Kv Ss
|
Description |
Supply Erection And Commissioning Of 400 Kv Dc Line From Udangudi Switchyard To Samugarengapuram 400 Kv Ss
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_396827_1 |
Reference Number |
CE/C/TR/T-51/2023-24 |
Tender Fee | 0 |
EMD | 2.34 Crore |
Tender Value | |
Place | O/o the CE/C/TR/Chennai |
Link | https://tntenders.gov.in |
Start Date | December 20, 2023 16:30 |
End Date |
23/01/2024 ( Expired 512 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type