Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Of Lawaghoghari Bijagaon Bhuari Road Length 15.00 Km. Including Electric Pole Shifting And Height Extension Work. (1st Call)
|
| Description |
Reconstruction Of Lawaghoghari Bijagaon Bhuari Road Length 15.00 Km. Including Electric Pole Shifting And Height Extension Work. (1st Call)
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_282607_1 |
|
Reference Number |
09/GEN/2023-24 |
| Tender Fee | 30000 |
| EMD | 10 Lakh |
| Tender Value | |
| Place | O/O the Chief Engineer, PWD Jabalpur Zone Jabalpur |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | June 15, 2023 22:00 |
| End Date |
Expired
30/06/2023
Expired 1101 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Macadamization of road from sopat surrender gujjar basti qazigund kulgam km 1st
Macadamization of road from sopat surrender gujjar basti qazigund kulgam km 1st
Read moreProvn of view cutter of size 90 mtr length and 8 ft height at panchjanya auditorium under ge dronachal
Provn of view cutter of size 90 mtr length and 
 8 ft height at panchjanya auditorium under ge 
 dronachal
Read moreIn the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreShifting with reconstruction of existing electrical poles for construction of road from nh-5a to masakani village jadupur gp under r.w.e.s kendrapara.
Shifting with reconstruction of&#x0d existing electrical poles for&#x0d construction of road from nh-5a to&#x0d masakani village jadupur gp under&#x0d r.w.e.s kendrapara.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreGeneral repair and reconstruction of septic tank cover slab and allied works at chick sexing school livestock management training centre kudapanakunnu civil work general civil work
General repair and reconstruction of septic tank cover slab and allied works at&#x0d chick sexing school livestock management training centre kudapanakunnu civil work &#x0d general civil work &#x0d
Read moreShifting of 11 kv line/ss/lt line at- kalam, kalampat and suanar due to widening of udayapur banti (rd road culvert) to kakatpur road under r.w.e.s puri.
Shifting of 11 kv line/ss/lt line at-&#x0d kalam, kalampat and suanar due to&#x0d widening of udayapur banti (rd&#x0d road culvert) to kakatpur road&#x0d under r.w.e.s puri.
Read moreof your Industry type