Particulars | Details |
---|---|
Title |
Extension Of 6.6 Kv O/H Line From Jarlahi Pump To Jarlahi Main Patch Pump, Dismantling Of 3.3 Kv O/H Line From Budora Sub Station To Jarlahi Pump , Extension And Repairing Of Lighting Line At Asha Kothi Of Phularitand, Amp Colliery Barora Area
|
Description |
Extension Of 6.6 Kv O/H Line From Jarlahi Pump To Jarlahi Main Patch Pump, Dismantling Of 3.3 Kv O/H Line From 
Budora Sub Station To Jarlahi Pump , Extension And Repairing Of Lighting Line At Asha Kothi Of Phularitand, Amp 
Colliery Barora Area
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_313109_1 |
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/164 |
Tender Fee | 0 |
EMD | 2900 |
Tender Value | |
Place | AMP COLLIERY BARORA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324472 |
Start Date | July 23, 2024 00:00 |
End Date |
02/08/2024 ( Expired 312 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 33 kv line from 33/11 kv medical sub-station to proposed 33/11 kv sub-station at bhumi vikas evam grih sansthan yojna no.-3, jhansi
Construction of 33 kv line from 33/11 kv medical sub-station to proposed 33/11 kv sub-station at bhumi vikas evam grih sansthan yojna no.-3, jhansi
Read moreRepairing of 02 no gec make 315 kva 3.3 kv to 570 volt an-an type of cooling tran switch unit installed at different panel sub-station for 315 kv transformer sr. no. missing of bhadra 7 8 mine
Repairing of 02 no gec make 315 kva 3.3 kv to 570 volt an-an type of cooling tran switch unit installed at different panel sub-station for 315 kv transformer sr. no. missing of bhadra 7 8 mine
Read moreDi and erection of 11kv overhead line for smooth power supply to budora colony for pumping and lighting purpose under phularitand amp colliery, barora area.
Di and erection of 11kv overhead line for 
 smooth power supply to budora colony for pumping 
 and lighting purpose under phularitand amp colliery, 
 barora area.
Read moreReplacing of b/d motor of 4000gpm pump of main patch and di of its pipe line in jarlahi patch of phularitand ocp in amp colliery.
Replacing of b/d motor of 4000gpm pump of main 
 patch and di of its pipe line in jarlahi patch of 
 phularitand ocp in amp colliery.
Read moreRepairing and di o/h 440/220v lbc(ii)di of 440v lighting of o/h line npts(iii)repairing maintenance of o/h line and jointing of cable different location(iv)and di of 440v power o/h from attendance room to 6/10 colony mdc
Repairing and di o/h 440/220v lbc(ii)di of 440v lighting of o/h line npts(iii)repairing maintenance of o/h line and jointing of cable different location(iv)and di of 440v power o/h from attendance room to 6/10 colony mdc
Read moreDi and extension of 220v o/h line for provide power in pumping place and mine periphery at old ghutway patch-3 at damoda colliery under barora area.
Di and extension of 220v o/h line for 
 provide power in pumping place and mine 
 periphery at old ghutway patch-3 at damoda 
 colliery under barora area.
Read moreRepairing and maintenance of 6.6kv o/h line from sadbhavna substation to sadbhavna pump site under amp colliery, barora area.
Repairing and maintenance of 6.6kv o/h line from 
 sadbhavna substation to sadbhavna pump site 
 under amp colliery, barora area.
Read moreRepairing and maintenance of 11kv o/h line mobile substation at dozer section utilized for 440v power supply to muraidih weighbridge and muraidih filter plant under amp colliery, barora area.
Repairing and maintenance of 11kv o/h line mobile 
 substation at dozer section utilized for 440v power 
 supply to muraidih weighbridge and muraidih filter 
 plant under amp colliery, barora area.
Read moreRepair and maintenance of damaged 11kv o/h line f.no.-5 from colliery office to muraidih cisf camp for safety purpose and changing of rusted poles and conductor in 440v o/h line to smooth power supply of muraidih new colony under amp colliery.
Repair and maintenance of damaged 11kv o/h line f.no.-5 from colliery office to muraidih cisf camp for safety purpose and changing of rusted poles and conductor in 440v o/h line to smooth power supply of muraidih new colony under amp colliery.
Read moreNecessary repair and maintenance of 440v o/h line with replacing of damaged poles of budora colony for safety purpose at phularitand, amp colliery.
Necessary repair and maintenance of 440v o/h line 
 with replacing of damaged poles of budora colony 
 for safety purpose at phularitand, amp colliery.