Tender Details

Particulars Details
Title
Stabilization Of Collapsed Hill Portion With Rock Bolts And Construction Of Retaining Wall In Sy. No. 16/1 At Cortalim Village In Cortalim Constituency
Description
Stabilization Of Collapsed Hill Portion With Rock Bolts And Construction Of Retaining Wall In Sy. No. 16/1 At Cortalim Village In Cortalim Constituency
Organisation WATER RESOURCE DEPARTMENT | State Govt. and UT
Tender Id 2025_WRD_19226_1
Reference
Number
WDII/TECH/F17/41e/2024-25/SN1
Tender Fee 26000
EMD 17.37 Lakh
Tender Value -
Place Rawanfond
Link
View Original Tender Notice

https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=19663

Start Date January 03, 2025 23:30
End Date
Expired 18/01/2025

Expired 635 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Slope stabilization to portion surrounding reservoir no 3 at bhandarwada hill reservoir joseph bapishta garden in e ward

Slope stabilization to portion surrounding reservoir no 3 at bhandarwada hill reservoir joseph bapishta garden in e ward

Read more
Renovation and stabilization of lina bund in sy. no. 106/2 (phase ii) at village deussua in velim constituency of salcete taluka.

Renovation and stabilization of lina bund in sy. no. 106/2 (phase ii) at village deussua in velim constituency of salcete taluka.

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Stabilization of hill slope by construction retaining wall in sy. no. 206/10 in oitiyant in taliegao constituency.

Stabilization of hill slope by construction retaining wall in sy. no. 206/10 in oitiyant in taliegao constituency.

Read more
Providing labour, tools and machineries for prive measures for the collapsed portion of the hill behind smt. milagrina baretto house at cortalim constituency.

Providing labour, tools and machineries for prive measures for the collapsed portion of the hill behind smt. milagrina baretto house at cortalim constituency.

Read more
Desilting of nallah from sy. no. 66 to sy. no. 85 at vollant thane in v.p. cortalim quelossim in cortalim constituency.

Desilting of nallah from sy. no. 66 to sy. no. 85 at vollant thane in v.p. cortalim quelossim in cortalim constituency.

Read more
Improvement to the pond in sy. no. 257 at manxer in v.p. cortalim in cortalim constituency.

Improvement to the pond in sy. no. 257 at manxer in v.p. cortalim in cortalim constituency.

Read more
Improvement to the pond in sy. no. 257 at manxer in v.p. cortalim in cortalim constituency

Improvement to the pond in sy. no. 257 at manxer in v.p. cortalim in cortalim constituency

Read more
Stabilization of collapsed hill slope opposite to the government primary school at baradi in village velim in velim constituency.

Stabilization of collapsed hill slope opposite to the government primary school at baradi in village velim in velim constituency.

Read more
Click Here to Download Dockets