Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Stabilization Of Collapsed Hill Portion With Rock Bolts And Construction Of Retaining Wall In Sy. No. 16/1 At Cortalim Village In Cortalim Constituency
|
| Description |
Stabilization Of Collapsed Hill Portion With Rock Bolts And Construction Of Retaining Wall In Sy. No. 16/1 At Cortalim Village In Cortalim Constituency
|
| Organisation | WATER RESOURCE DEPARTMENT | State Govt. and UT |
| Tender Id | 2025_WRD_19226_1 |
|
Reference Number |
WDII/TECH/F17/41e/2024-25/SN1 |
| Tender Fee | 26000 |
| EMD | 17.37 Lakh |
| Tender Value | - |
| Place | Rawanfond |
| Link |
View Original Tender Notice
https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=19663 |
| Start Date | January 03, 2025 23:30 |
| End Date |
Expired
18/01/2025
Expired 635 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Slope stabilization to portion surrounding reservoir no 3 at bhandarwada hill reservoir joseph bapishta garden in e ward
Slope stabilization to portion surrounding reservoir no 3 at bhandarwada hill reservoir joseph bapishta garden in e ward
Read moreRenovation and stabilization of lina bund in sy. no. 106/2 (phase ii) at village deussua in velim constituency of salcete taluka.
Renovation and stabilization of lina bund in sy. no. 106/2 (phase ii) at village deussua in velim constituency of salcete taluka.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreStabilization of hill slope by construction retaining wall in sy. no. 206/10 in oitiyant in taliegao constituency.
Stabilization of hill slope by construction retaining wall in sy. no. 206/10 in oitiyant in taliegao constituency.
Read moreProviding labour, tools and machineries for prive measures for the collapsed portion of the hill behind smt. milagrina baretto house at cortalim constituency.
Providing labour, tools and machineries for prive measures for the collapsed portion of the hill behind smt. milagrina baretto house at cortalim constituency.
Read moreDesilting of nallah from sy. no. 66 to sy. no. 85 at vollant thane in v.p. cortalim quelossim in cortalim constituency.
Desilting of nallah from sy. no. 66 to sy. no. 85 at vollant thane in v.p. cortalim quelossim in cortalim constituency.
Read moreImprovement to the pond in sy. no. 257 at manxer in v.p. cortalim in cortalim constituency.
Improvement to the pond in sy. no. 257 at manxer in v.p. cortalim in cortalim constituency.
Read moreImprovement to the pond in sy. no. 257 at manxer in v.p. cortalim in cortalim constituency
Improvement to the pond in sy. no. 257 at manxer in v.p. cortalim in cortalim constituency
Read moreStabilization of collapsed hill slope opposite to the government primary school at baradi in village velim in velim constituency.
Stabilization of collapsed hill slope opposite to the government primary school at baradi in village velim in velim constituency.
Read moreof your Industry type