Tender Details

Particulars Details
Title
Trd Work For Removal Of Psr In Kte Yard Through Track Structure Upgradation And Realignment Of Up & Dn Main Lines.
Description
Trd Work For Removal Of Psr In Kte Yard Through Track Structure Upgradation And Realignment Of Up & Dn Main Lines.
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date September 29, 2026 21:12
End Date
Open 21/10/2026

6 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Removal of psr in katni yard through track structure upgradation and realignement of up & dn main lines under jurisdition of divisional engineer (central) jabalpur.

Removal of psr in katni yard through track structure upgradation and realignement of up & dn main lines under jurisdition of divisional engineer (central) jabalpur.

Read more
Removal of chocking removal work of pipe lines under sub dn iii, bikaner

Removal of chocking removal work of pipe lines under sub dn iii, bikaner

Read more
Electrical trd work for (i) nimpura (nmp) r/yard - additional lines between line no.18 of nmp r.yard and new clinker siding. (ii) provision of 06 nos. of stabling lines at nimpura (nmp) reception yard of kgp division.

Electrical trd work for (i) nimpura (nmp) r/yard - additional lines between line no.18 of nmp r.yard and new clinker siding. (ii) provision of 06 nos. of stabling lines at nimpura (nmp) reception yard of kgp division.

Read more
Electrical trd portion of work in connection with 1) hirenanduru - extension of loop lines at hirenanduru yard. 2) kalaburagi - conversion and upgradation of existing sidings for demu operation.

Electrical trd portion of work in connection with 1) hirenanduru - extension of loop lines at hirenanduru yard. 2) kalaburagi - conversion and upgradation of existing sidings for demu operation.

Read more
S&t work for yard modification to enhance cal of short csl lines and a long loop line at dn grid and pathway in station yards at tunia.

S&t work for yard modification to enhance cal of short csl lines and a long loop line at dn grid and pathway in station yards at tunia.

Read more
1) trd works in connection with yard improvement work rny-rpan jn ttr (fs+tws+wcms)-6 sets (1:12) & ttr (tws+wcms)-28 sets.2) at rangiya division:-trd works in connection with trr (p) dn main line (60 kg) 15.800 km at km 362/9-369/9, 371/3-6, 371/9-374/8 & 377/2-382/8.

1) trd works in connection with yard improvement work rny-rpan jn ttr (fs+tws+wcms)-6 sets (1:12) & ttr (tws+wcms)-28 sets.2) at rangiya division:-trd works in connection with trr (p) dn main line (60 kg) 15.800 km at km 362/9-369/9, 371/3-6, 371/9-374/8 & 377/2-382/8.

Read more
Construction of railway formation including blanketing material, side drain & other miscellaneous work for construction of full-length stabling lines by extending existing short-length track machine siding in tangarbansali station yard (tgb) under jurisdiction of sr den south of ranchi division.

Construction of railway formation including blanketing material, side drain & other miscellaneous work for construction of full-length stabling lines by extending existing short-length track machine siding in tangarbansali station yard (tgb) under jurisdiction of sr den south of ranchi division.

Read more
1) solapur division- various types of track works under the yard improvement umbrella at shendri, barshi town, pajari, dharashiv, yedshi, dhoky, ausa road, harangul, latur, modlimb, pandharpur, sangola, jath road, dhalgaon, kavathe mahankal, salgare & arag yard. 2)yard imp works like trr, tfr, tbr and ttr (tws) in pr lines for brb, jeur, ppj, prwd, wka along with lur, hgl, osa and bot yard.3) twr work in kwv-sei 13.2 km under aden/lur sub-division in sur division. 4) execution of fb weldin

1) solapur division- various types of track works under the yard improvement umbrella at shendri, barshi town, pajari, dharashiv, yedshi, dhoky, ausa road, harangul, latur, modlimb, pandharpur, sangola, jath road, dhalgaon, kavathe mahankal, salgare & arag yard. 2)yard imp works like trr, tfr, tbr and ttr (tws) in pr lines for brb, jeur, ppj, prwd, wka along with lur, hgl, osa and bot yard.3) twr work in kwv-sei 13.2 km under aden/lur sub-division in sur division. 4) execution of fb weldin

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise