Tender Details
Particulars | Details |
---|---|
Title |
Wbmad/Mm/Nit 27e/2023 24/2
|
Description |
Construction Of Black Top Road From H/O, Lt. Satu Bhattacharjee To H/O, Antu Bhattacharjee, From Lt. Mani Bose To Park At Bankimpally In Ward No. 10 Under Madhyamgram Municipality.
|
Organisation | Government of West Bengal |
Tender Id | 2023_MAD_625730_2 |
Reference Number |
WBMAD/MM/NIT-27e/2023-24 |
Tender Fee | 0 |
EMD | 6721 |
Tender Value | |
Place | MADHYAMGRAM MUNICIPALITY |
Link | https://wbtenders.gov.in |
Start Date | December 20, 2023 16:30 |
End Date |
18/01/2024 ( Expired 484 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreCc road and drain contruction from champalal rajak to girraj kushah, from shop of sunil maharaj to munna kushwah lamberdar in ward no 15 at nagar parisad badarwas district shivpuri
Cc road and drain contruction from champalal rajak to girraj kushah, from shop of sunil maharaj to munna kushwah lamberdar in ward no 15 at nagar parisad badarwas district shivpuri
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreZone no. 03, ward no. 10, construction of rcc drain, culvert and road from dr. shabhakant dwivedi ji house to shri hari singh ji house.
Zone no. 03, ward no. 10, construction of rcc drain, culvert and road from dr. shabhakant dwivedi ji house to shri hari singh ji house.
Read moreConstruction work of c.c. road at ward no 31 subhas nagar main road didi shop to bhawan lal house vidisha
Construction work of c.c. road at ward no 31 subhas nagar main road didi shop to bhawan lal house vidisha
Read moreof your Industry type