Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Work In Deposite Scheme Under Ee Eudd I Sdo Sipri Jhansi
|
Description |
Work Of Temporary Electrical Connection Of Application Number 1010114924 On Nivesh Mitra Portal Under The Deposit Scheme Item In The Jurisdiction Of Sdo Sipri Under Executive Engineer Eudd I Jhansi
|
Organisation | Dakshinanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2025_DVVNL_1045587_1 |
Reference Number |
06/EUDC/JHS/2025-26 |
Tender Fee | 1000 |
EMD | 7500 |
Tender Value | |
Place | EE EUDD I SDO Sipri Jhansi |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1898055 |
Start Date | June 03, 2025 23:00 |
End Date |
18/06/2025 ( Expired 4 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreWbphed/ee/md/niet_22 (3rd call) of 2025-2026, sl.no.11
Construction of boundary wall at head work site of betahal water supply scheme under harishchandrapur-ii block under malda division, phe dte. in the district of malda. (3rd call)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreEmergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i
Emergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i
Read moreStrengthening work of service lane and underpass of amar shaheedpath under crif in district lucknow
Strengthening work of service lane and underpass of amar shaheedpath under crif in district lucknow
Read moreRepair to road including road furniture in sector b otm accn area under age br i of ge south patiala
Repair to road including road furniture in sector b otm accn area under age br i of ge south patiala
Read moreof your Industry type