Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Periodical Repair Of Kn Road Length 400 00 Km During The Year 2025 26 Sh Patch Soling Patch Metalling Grouting Carpeting Etc
|
| Description |
Periodical Repair Of Kn Road Length 400 00 Km During The Year 2025 26 Sh Patch Soling Patch Metalling Grouting Carpeting Etc
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_65425_1 |
|
Reference Number |
51/EE/KD/2025-26 |
| Tender Fee | 1000 |
| EMD | 43323 |
| Tender Value | |
| Place | kumarghat |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=66588 |
| Start Date | September 09, 2025 22:30 |
| End Date |
Expired
16/09/2025
Expired 263 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Patch repair of (sh, mdr, odr road) in block-rampur sangramgarh (year 2026-27)
Patch repair of (sh, mdr, odr road) in block-rampur sangramgarh (year 2026-27)
Read moreStrengthening of road from kanchanpur to machmara from ch 4.00 km to ch 12.50 km , under jampui hill sub-division, pwd r and b during the f.y. 2025 2026 sh side shouldering, repair pot holes, bm, tack coat, carpeting, seal coat, surface drain, mtc
Strengthening of road from kanchanpur to machmara from ch 4.00 km to ch 12.50 km , under jampui hill sub-division, pwd r and b during the f.y. 2025 2026 sh side shouldering, repair pot holes, bm, tack coat, carpeting, seal coat, surface drain, mtc
Read moreStrengthening of road from kanchanpur to machmara from ch 12.50 km to ch 19.126 km , under jampui hill sub-division, pwd r and b during the f.y. 2025 2026 sh side shouldering, repair pot holes, bm,tack coat, carpeting, seal coat, surface drain, mtc
Strengthening of road from kanchanpur to machmara from ch 12.50 km to ch 19.126 km , under jampui hill sub-division, pwd r and b during the f.y. 2025 2026 sh side shouldering, repair pot holes, bm,tack coat, carpeting, seal coat, surface drain, mtc
Read moreConstruction of sdbc road at 5 nos. connecting road of west bishmuri village road (length 1.41 km) with c.d. works of district kokrajhar, btc, assam under sopd for the year 2025-26. tn_01_03
Construction of sdbc road at 5 nos. connecting road of west bishmuri village road (length 1.41 km) with c.d. works of district kokrajhar, btc, assam under sopd for the year 2025-26. tn_01_03
Read moreMaintenance of the office of the executive engineer, mohanpur division during the year 2026-27/sh water supply, sanitation and other allied works, etc.
Maintenance of the office of the executive engineer, &#x0d mohanpur division during the year 2026-27/sh water supply, sanitation &#x0d and other allied works, etc
Read moreExtension of pipeline in different locations under west charakbai gp within the jurisdiction of dws sub-division, jolaibari during the year 2025-26 (ffc fund).
Extension of pipeline in different locations under west charakbai gp within the jurisdiction of dws sub-division, jolaibari during the year 2025-26 (ffc fund).
Read moreExtension and mtc. of pipeline from muhuripur pwd road to nakul sen house under charakbai gp within the jurisdiction of dws sub-division, jolaibari during the year 2025-26 (ffc work).
Extension and mtc. of pipeline from muhuripur pwd road to nakul sen house under charakbai gp within the jurisdiction of dws sub-division, jolaibari during the year 2025-26 (ffc work).
Read moreImp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26
Imp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26
Read moreRepair and maintenance of infrastructure assets in r-ii division during 2025-26.. sh - repair of damaged footpath at back lane of 91 to 100, lodhi estate under sub-division -v (r-ii).
Repair and maintenance of infrastructure assets in r-ii division during 2025-26.. sh - repair of damaged footpath at back lane of 91 to 100, lodhi estate under sub-division -v (r-ii).
Read moreProviding and fitting and fixing of centrifugal pump -motor for the alternative intake well pump house of swtp(0.72 mgd capacity), garadtilla, kamalpur during the year 2025-26.
Providing and fitting and fixing of centrifugal pump -motor for the alternative intake well pump house of swtp(0.72 mgd capacity), garadtilla, kamalpur during the year 2025-26.
Read moreof your Industry type