Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ferrocover Supply And Fixing Work In Municipal Area.
|
| Description |
Ferrocover Supply And Fixing Work In Municipal Area.
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_DLB_363711_15 |
|
Reference Number |
NIT NO 29/2023-24 |
| Tender Fee | 1000 |
| EMD | 80000 |
| Tender Value | - |
| Place | Municipal Board Nimbahera |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | September 07, 2023 15:30 |
| End Date |
Expired
18/09/2023
Expired 1105 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreDevelopment of the children park and lighting on model cheruvu in huzurabad municipality under nagarabhivruddi grants-2nd call
Development of the children park and lighting on model cheruvu in huzurabad municipality under nagarabhivruddi grants-2nd call
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreConstruction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Read moreProcurement of medical equipments for hospitals in shimoga
Procurement of medical equipments for hospitals in shimoga
Read moreBt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Bt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type