Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Sysmex Quality Control,Swelab Lumi L 1 Lyse 200ml,Swelab Lumi L 2 Lyse 500ml,Swelab Lumi Quality Co
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2025/B/6308205 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | June 04, 2025 18:21 |
End Date |
25/06/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreNozzle for cutting cutogen no. 2 or blow pipe. size 1/8" (3mm) (make-esab, l&t, d&h sachron, indian
Read more
Nozzle for cutting cutogen no. 2 or blow pipe. size 1/8" (3mm) (make-esab, l&t, d&h sachron
Read more
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Read moreProvision towards laying of 250mm dia di k-9 w/s rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-6 part-2 in ward no-1 of bmc, bbsr
Provision towards laying of 250mm dia di k-9 w/s rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-6 part-2 in ward no-1 of bmc, bbsr
Read moreDrilling of bore well dabeerpura fazal supply and co. opp: masjid lane yakutpura assembly constituency (location : fazal supply and co. opp: masjid lan 6 1/2 dia bore well). proposed by hon ble mla yakutpura assembly constituency under sdf- 2023-24
Drilling of bore well dabeerpura fazal supply and co. opp: masjid lane yakutpura assembly constituency (location : fazal supply and co. opp: masjid lan 6 1/2 dia bore well). proposed by hon ble mla yakutpura assembly constituency under sdf- 2023-24
Read moreStrengthening work 1 kuthiyana to raduapura rd l 0.94 km, 2 ranpur to kuthiyana rd, raipura to bahadurpur rd, tareni to durgadas ki garhi rd, tareni to kirrayach rd, dhaneta to udalpura rd, vitt ka pura to bireharua rd l 2.20 km. total length 3.14 km
Strengthening work 1 kuthiyana to raduapura rd l 0.94 km, 2 ranpur to kuthiyana rd, raipura to bahadurpur rd, tareni to durgadas ki garhi rd, tareni to kirrayach rd, dhaneta to udalpura rd, vitt ka pura to bireharua rd l 2.20 km. total length 3.14 km
Read moreof your Industry type