Overhauling Of 50 Kva 550/440 V 220 V Phase To Phase Lighting Transformer Of Bastacolla Ocp, Bastacolla Colliery And Treatment Of Its Earth Pit..
Description
Overhauling Of 50 Kva 550/440 V 220 V Phase To Phase Lighting Transformer Of Bastacolla Ocp, Bastacolla Colliery And Treatment Of Its Earth Pit..
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_324907_1
Reference
Number
BCCL/BA-IX/ENM/24-25/212 06/01/2025
Tender Fee 0
EMD 600
Tender Value
Place BASTACOLLA AREA
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336797
Start Date January 06, 2025 14:30
End Date

18/01/2025 ( Expired 161 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ktps-vi stage-em-construction of new individual earth pit for existing lightning arrestors and cvts in 400kv swyd and outdoor power transformer yard of ktps-vi stage

Ktps-vi stage-em-construction of new individual earth pit for existing lightning arrestors and cvts in 400kv switchyard and outdoor power transformer yard of ktps-vi stage

Read more
Special repair to bldg no np-60 (block of 08 qtr) at vijender vihar and provn of 5 kva single phase isolation transformer for cbct machine at 200 mdc under ge south pathankot

Special repair to bldg no np-60 (block of 08 qtr) at vijender vihar and provn of 5 kva single phase isolation transformer for cbct machine at 200 mdc under ge south pathankot

Read more
Replacement of damaged coupling of 4 cusec 30 mtr hc pump of unit no. 3 and minor repairs to 250 kva electric transformer at lis didwara.

Replacement of damaged coupling of 4 cusec 30 mtr hc pump of unit no. 3 and minor repairs to 250 kva electric transformer at lis didwara.

Read more
Electrical wiring of kuya ocp wb and dg connection for 5kva dg set parking area of bastacolla area office to iccc control room under bastacolla area.

Electrical wiring of kuya ocp wb and dg connection for 5kva dg set parking area of bastacolla area office to iccc control room under bastacolla area.

Read more
Construction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50

Construction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50

Read more
Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649/5514 including plc based amf panel, complete cabling, const. of c.c. foundation and other associated works complete at tw in zone-1 and 2 of npp muzaffarnagar

Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649/5514 including plc based amf panel, complete cabling, const. of c.c. foundation and other associated works complete at tw in zone-1 and 2 of npp muzaffarnagar

Read more
Maintenance of 3.3kv oh line from dumerbera sub-station to 16b quarry and installation of 400a rated goab and do fuse at 16b quarry for safe operation 250kva 3.3kv/440v transformer installated at 16b quarry of ara colliery under kuju

Maintenance of 3.3kv oh line from dumerbera sub-station to 16b quarry and installation of 400a rated goab and do fuse at 16b quarry for safe operation 250kva 3.3kv/440v transformer installated at 16b quarry of ara colliery under kuju

Read more
Operation and maintenance of 15.1 mld water treatment plant,1.81 ml cwr and 500 kva substation at jhargram municipal area for the period of 60 months including supply of all materials to be used daily like chlorine,

Operation and maintenance of 15.1&amp#x0d mld water treatment plant,1.81 ml cwr and 500 kva substation at jhargram municipal area for the period of 60 months including supply of all materials to be used daily like chlorine,

Read more
Lowering, transporting, laying and fitting of 6 inch ms pipeline from 29l/2d to 31l/16d borehole of no. 8 pit of nimcha r colliery under satgram-sripur area

Lowering, transporting, laying and fitting of 6 inch ms pipeline from 29l/2d to 31l/16d borehole of no. 8 pit of nimcha colliery under satgram-sripur area

Read more
Overhauling oil skimmer, day-to-day repair/ maintenance of effluent treatment plant (etp), and day-to-day assistance to operation of oil skimmer and etp at central workshop, tadali

Overhauling oil skimmer, day-to-day repair/ maintenance of effluent treatment plant (etp), and day-to-day assistance to operation of oil skimmer and etp at central workshop, tadali

Read more