Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Procurement Of 600 Nb Ms Sw Pipes For Old Intake Water Pipe Lines Of Stps Through Capex 2024 25 Under Cip Department,Stps
|
Description |
Procurement Of 600 Nb Ms Sw Pipes For Old Intake Water Pipe Lines Of Stps Through Capex 2024 25 Under Cip Department,Stps
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id | 2025_WBPDC_835903_1 |
Reference Number |
WBPDCL/STP/NIT/E3970/25-26 |
Tender Fee | 0 |
EMD | 1.02 Lakh |
Tender Value | |
Place | ADMIN BUILDING STPS, THE WBPDCL |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1862928 |
Start Date | April 22, 2025 21:30 |
End Date |
06/05/2025 ( Expired 49 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of pump with motor and other accessories for ash water recovery system under ahp-mm dept., ktps through capex 25-26.
Procurement of pump with motor and other accessories for ash water recovery system under ahp-mm dept., ktps through capex 25-26.
Read moreProcurement of 400 nb erw pipe for ash water recovery system under ahp-mm dept., ktps through capex 25-26
Procurement of 400 nb erw pipe for ash water recovery system under ahp-mm dept., ktps through capex 25-26
Read moreProcurement of steel material for life enhancement and structural strengthening job of conveyor-2a1 and 2b1 under chp-mm dept., ktps through capex 25-26
Procurement of steel material for life enhancement and structural strengthening job of conveyor-2a1 and 2b1 under chp-mm dept., ktps through capex 25-26
Read moreRepairs/repalacemnt of existing ac/pvc pipe line of cantonment water supply system for the convent road burnassery area at kannur
Repairs/repalacemnt of existing ac/pvc pipe line of cantonment water supply system for the convent road burnassery area at kannur
Read moreSpecial repair to water supply lines by replacing ci to di pipes at subroto marg (phase-i) and replacement of ber equipment at afs begumpet under ge (af) hakimpet
Special repair to water supply lines by replacing ci to di pipes at subroto marg (phase-i) and replacement of ber equipment
 at afs begumpet under ge (af) hakimpet
Read moreBalance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Read moreLeakage and brust repairing of pipeline and water supply from ohsr to various villages and dhanies originating from kalaynipura pumping station all type of prevetive and break down maintenacne of pipe lines for the cluster under fcp arain-kishangarh
Leakage and brust repairing of pipeline and water supply from ohsr to various villages and dhanies originating from kalaynipura pumping station all type of prevetive and break down maintenacne of pipe lines for the cluster under fcp&#x0d arain-kishangarh
Read moreLeakage and brust repairing of pipeline and water supply from ohsr to various villages and dhanies originating from akodiya pumping station including all type of prevetive and break down maintenacne of pipe lines, for the cluster under fcp arain
Leakage and brust repairing of pipeline and water supply from ohsr to various villages and dhanies originating from akodiya pumping station including all type of prevetive and break down maintenacne of pipe lines, for the cluster under fcp arain
Read moreLeakage and brust repairing of pipeline and water supply from ohsr to various villages and dhanies originating from arain pumping station including all type of prevetive and break down maintenacne of pipe lines, for the cluster under fcp arain-k
Leakage and brust repairing of pipeline and water supply from ohsr to various villages and dhanies originating from arain pumping station including all type of prevetive and break down maintenacne of pipe lines, for the cluster under fcp arain-k
Read moreInstallation of one no. 6 in dia ms pipe delivery line 600 mtr. from 23bdip 10l to 23bdip 1l, and then to 25d 1l through inclined, along with installation of two no s of goalposts for a newly installed pump of 23b dip in underground at mic, jpc
Installation of one no. 6 in dia ms pipe delivery line 600 mtr. from 23bdip 10l to 23bdip 1l, and then to 25d 1l through inclined, along with installation of two no s of goalposts for a newly installed pump of 23b dip in underground at mic, jpc
Read moreof your Industry type