Rf S For 1200 Mw Rtc Power From Ists Connected Re Power Projects In India (Seci Rtc Iv)
|
Description |
Rf S For 1200 Mw Rtc Power From Ists Connected Re Power Projects In India (Seci Rtc Iv)
|
Organisation | Solar Energy Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id | 2024_SECI_777307_1 |
Reference Number |
SECI/CnP/RTC-IV/1200MW |
Tender Fee | 59000 |
EMD | 25.81 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1081305 |
Start Date | November 05, 2024 22:30 |
End Date |
16/12/2024 ( Expired 203 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewProcurement of 1000 mw energy&#x0d storage capacity (for 9 hours discharge with&#x0d maximum 6 hours continuous discharge) for 40&#x0d years from grid connected pumped hydro&#x0d storage plant/s through competitive bidding
Read moreRfs for setting up 1200 mw ists-connected spv power projects with 600mw/3600mwh ess (seci-ists-xxi)
Rfs for setting up 1200 mw ists-connected spv power projects with 600mw/3600mwh ess (seci-ists-xxi)
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreProviding metering panel board for residential qtr. (type-ii/ block-ii), type-iii/block-i and ii), type-iv and type-iv (spl), laying of power cables from the main feeder of sub-station to electric control room, main control room to womens hostel
Providing metering panel board for residential qtr. (type-ii/ block-ii), type-iii/block-i and ii), type-iv and type-iv (spl), laying of power cables from the main feeder of sub-station to electric control room, main control room to womens hostel
Read moreLabour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Labour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Read more2000 mw ists-connected solar pv power projects with 1000 mw/ 4000 mwh ess in india (seci-ists-xx)
2000 mw ists-connected solar pv power projects with 1000 mw/ 4000 mwh ess in india (seci-ists-xx)
Read moreRfs of srpd for setting up of tentative cumulative capacity of 1000 kw grid connected rooftop solar power projects (without battery storage) including 5 years of comprehensive oandm civil secretariat complex itanagar under capex mode under pmsgmby
Rfs of srpd for setting up of tentative cumulative capacity of 1000 kw grid connected rooftop solar power projects (without battery storage) including 5 years of comprehensive oandm civil secretariat complex itanagar under capex mode under pmsgmby
Read moreWork for shifting of filled and empty hydrogen cylinders from hydrogen plant 2 and 3 to unit 10 11 2x250 mw ,other power station and for hst etc at stps mppgclsarni
Work for shifting of filled and empty hydrogen cylinders from hydrogen plant 2 and 3 to unit 10 11 2x250 mw ,other power station and for hst etc at stps mppgclsarni
Read moreTtps es circle em i providing temporary lt 3 phase supply arrangement for various overhauling works connected with tm i and cmd i and other emergency lighting works in p h area and disconnection of power cables of various valve motors as dema
Ttps es circle em i providing temporary lt 3 phase supply arrangement for various overhauling works connected with tm i and cmd i and other emergency lighting works in p h area and disconnection of power cables of various valve motors as dema
Read moreof your Industry type