Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Interlocking Construction Work On The Side Track From Prakash Machining Center To Govind Auto In Mau Mahadev
|
| Description |
Interlocking Construction Work On The Side Track From Prakash Machining Center To Govind Auto In Mau Mahadev
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_DOLBU_873790_1 |
|
Reference Number |
488/NPD/2023-24 RVA-2 |
| Tender Fee | 2000 |
| EMD | 39000 |
| Tender Value | |
| Place | EO NAGAR PALIKA DIBAI |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | December 23, 2023 21:30 |
| End Date |
Expired
08/01/2024
Expired 906 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district sultanpur, construction of interlocking road from surjan purwa link road to hariram prajapati house in bangarkala, karaudikala, lot no 3
Under district sultanpur, construction of interlocking road from surjan purwa link road to hariram prajapati house in bangarkala, karaudikala, lot no 3&#x0d
Read moreUnder district sultanpur, construction of interlocking road from the house of shri ramtej prajapati to the paved road in village lohar west, lot no 1
Under district sultanpur, construction of interlocking road from the house of shri ramtej prajapati to the paved road in village lohar west, lot no 1&#x0d
Read moreUnder district sultanpur, construction of interlocking road from haripur-bharkhare to the house of wrestler veer baba to abhimanyu verma house in village alipur under khand bhadaiya, lot no 4
Under district sultanpur, construction of interlocking road from haripur-bharkhare to the house of wrestler veer baba to abhimanyu verma house in village alipur under khand bhadaiya, lot no 4&#x0d
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreSide track interlocking construction work from patanjali arogya center to gill auto service.
Side track interlocking construction work from patanjali arogya center to gill auto service.
Read moreConstruction work of interlocking tiles from shyamji traders to nareshs shop in mau mahadev
Construction work of interlocking tiles from shyamji traders to nareshs shop in mau mahadev
Read moreImprovement work of side track by interlocking from ekta sweet house to prakash chemist in ward-25 under zone-6
Improvement work of side track by interlocking from ekta sweet house to prakash chemist in ward-25 under zone-6
Read moreConstruction work of drain and interlocking tiles from gaurav painter house to chhotelal house in ward no 21 mau mahadev
Construction work of drain and interlocking tiles from gaurav painter house to chhotelal house in ward no 21 mau mahadev
Read moreof your Industry type