Tender Details
Particulars | Details |
---|---|
Title |
Nctps I Cm Circle Cm Ii Maintenance Of Sullage Line Sewer Line Cleaning Of Sewage Sullage Lines Chambers And Manholes For A Period Of One Year From 01.04.2025 To 31.03.2026
|
Description |
Nctps I Cm Circle Cm Ii Maintenance Of Sullage Line Sewer Line Cleaning Of Sewage Sullage Lines Chambers And Manholes For A Period Of One Year From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_528837_1 |
Reference Number |
CE/NCTPS-I/SE/CM/81/24-25 |
Tender Fee | 0 |
EMD | 13500 |
Tender Value | |
Place | NCTPS-I CHENNAI |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=629746 |
Start Date | March 01, 2025 00:00 |
End Date |
13/03/2025 ( Expired 91 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreOne time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreSupply of veg fresh, fruit fresh and ice (mm) at 387 (i) sup pl asc beas
Supply of veg fresh, fruit fresh and ice (mm) at 387 (i) sup pl asc beas for the period from 01 oct 2025 to 30 sep 2026
Read moreSupply of veg fresh, fruit fresh and ice (mm) at 106 (i) comp pl asc kapurthala
Supply of veg fresh, fruit fresh and ice (mm) at 106 (i) comp pl asc kapurthala for the period from 01 oct 2025 to 30 sep 2026
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreRepair and removal of blockages, cleaning of sewage line, manholes and septic tanks and misc repairs to upkeep the hygienic conditions of the area of vasanth enclave, mi and ml line, prtc, 106 inf bn, hq naval det under ge (north) bangalore
Repair and removal of blockages, cleaning of sewage line, manholes and septic tanks and misc repairs to upkeep the hygienic conditions of the area of vasanth enclave, mi and ml line, prtc, 106 inf bn, hq naval det under ge (north) bangalore
Read moreRoutine earth work for maintenance of rising and distribution mains up to 300 mm dia c i and d.i. and gi pipe lines including maintenance of valves etc. upto 300 mm dia at ctps colony, dvc, chandrapura.
Routine earth work for maintenance of rising and distribution mains up to 300 mm dia c i and d.i. and gi pipe lines including maintenance of valves etc. upto 300 mm dia at ctps colony, dvc, chandrapura.
Read moreCleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Cleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreof your Industry type