Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bagohi Kusa Increasing Of Up Long Haul Loop Line At Least Upto 1400 Mtr. For Accommodating Long Haul Trains.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78688546 |
|
Reference Number |
26-DDU-SRDEN-II-24-25 |
| Tender Fee | 0 |
| EMD | 1.99 Lakh |
| Tender Value | - |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/78688546/viewNitPdf_4787136.pdf |
| Start Date | January 29, 2025 23:33 |
| End Date |
Expired
20/02/2025
Expired 556 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Alteration in siemens make ei (electronic interlocking) system at 03 stations in connection with correction in yard layout work at : (i) bhkh: increasing of up long haul loop line at least upto 1400 mtr. for accommodating long haul trains. (ii) jhn: yard remodeling for increasing the csl of dn side common loop and over line in up loop line for simultaneous reception & dispatch facility at jakhim station.(iii) jpl: extension of shunting neck (50 m) of line no. 5 at seb side at jpl.
For complete deion and other details, please refer to tender
Read moreDeep screening and increasing ballast upto 300 mm for loop lines under the jurisdiction of den/north/ngp.
For complete deion and other details, please refer to tender
Read moreS&t work in connection with:- (a) bariarpur - provision of up directional loop at bariarpur station., (b) akbarnagar - provision of up directional loop at akbarnagar station., (c) provision of long haul loop line at sultanganj station in down direction.,
For complete deion and other details, please refer to tender
Read moreOhe work in connection with (a) provision of one directional loop at kalyanpur road station, (b) provision of up directional loop at akbarnagar station, (c) provision of up directional loop at bariarpur station & (d) provision of long haul loop line at sultanganj station in down direction of malda division.
For complete deion and other details, please refer to tender
Read moreConstruction of long haul loop in up grid by extending de or orl of up loop l/no.-1 at kte end with dispatch facility and connecting banking engine siding to up loop l/no.-1 at bsp end, at khongsara under the jurisdiction of aden/pendra.
For complete deion and other details, please refer to tender
Read moreOpen e-tender for civil works in connection with provision of long haul loop line at sultanganj station under assistant engineer/line/ jamalpur under sr. divisional engineer-iii/ eastern railway/ malda.
For complete deion and other details, please refer to tender
Read more1) odha- trackwork in connection with proposed yard remodelling for provision of additional passenger platform and stabling line for handling kumbh mela traffic in 2027. (01.01.16.25.3.50.005) (for bridge & earth work) 2) odha- trackwork in connection with yard remodeling for provision of long haul facilities for handling long-haul trains. (irpsm id - 01.01.16.25.3.50.001) (for bridge & earth work)
For complete deion and other details, please refer to tender
Read moreConstruction of long haul loop in up grid by extending orl of existing loop at bsp end at kalmitar & extending the existing de of up loop line no.4 at kte end at ghutku and development of new goods shed line by extending de of orl of dn loop l5 towards apr end in dead end form at harri under the jurisdiction of sr.den/central/bilaspur.
For complete deion and other details, please refer to tender
Read more(1) provision/modification of ohe inconnection with - construction of long haul loop line at ghutku by extending the existing de of up loop l/no.-4 at kte end. (2) hrb - development of new goods shed line by extending de of orl of dn loop l/5 towards apr end in dead end form (top wiring ).
For complete deion and other details, please refer to tender
Read moreS&t works in connection with 1) kltr: construction of long loop line in up grid by extending orl of existing loop at bsp end with alteration in existing pi. 2)construction of long haul loop at gtk by extending the existing de of up loop line no.4 at kte end with alteration in existing pi and 3) hrb: development of new goods shed line by extending de of orl of dn loop l/5 towards apr end in dead end form with alteration in existing ei over cic line of bsp division of secr.
For complete deion and other details, please refer to tender
Read moreof your Industry type