Tender Details
Particulars | Details |
---|---|
Title |
Ctr(p) And Trr(p) Work In Rha Gede And Rha Bnj Section Along With Other Ancillary Work Under Senior Section Engineer[P. Way]/Ranaghat In The Jurisdiction Of Assistant Engineer/Ranaghat/Sealdah.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79274104 |
Reference Number |
TN-224-24-25 |
Tender Fee | 0 |
EMD | 2.6 Lakh |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79274104/viewNitPdf_4819345.pdf |
Start Date | December 31, 2024 23:28 |
End Date |
24/01/2025 ( Expired 111 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreRepair/ replacement of flooring, sunken, joinery, plastering and other alliled works to otm accn in zone d at raiwala mil stn under age (i) raiwala
Repair/ replacement of flooring, sunken, joinery, plastering and other alliled works to otm accn in zone d at raiwala mil stn under age (i) raiwala
Read moreLaying of di pipe from bhainsa to wtp in connection to the work augmentation of water supply system along with ancillary work for patnagarh town under amrut 2.0
Laying of di pipe from bhainsa to wtp in connection to the work augmentation of water supply system along with ancillary work for patnagarh town under amrut 2.0
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreStage contract for ht/lt/distribution sub-stations along with other key material under various in the jurisdiction of kpdcl division shopian for the year 2025-26
Stage contract for ht/lt/distribution sub-stations along with other key material under various in the jurisdiction of kpdcl division shopian for the year 2025-26
Read moreP/f fountain, chainlink fencing/ welded mesh fencing and upgradation of pathway foot bridge brick planter and misc other work in mayur park, bhopal
P/f fountain, chainlink fencing/ welded mesh fencing and upgradation of pathway foot bridge brick planter and misc other work in mayur park, bhopal
Read moreTender for supply of equipment material design erection testing and commissioning for sop to phc bhageigarh by providing 100 kva sub station along with 11 kv ht line in section nakror under esd hpsebl tissa
Tender for supply of equipment material design erection testing and commissioning for sop to phc bhageigarh by providing 100 kva sub station along with 11 kv ht line in section nakror under esd hpsebl tissa
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreReinstatement of water supply channel/ drainage channel/gas channel/electricity channel as well as cable digging along with other ancillary works in the jurisdiction of yerwada -kalas-dhanori ward office. (part 2)
Reinstatement of water supply channel/ drainage channel/gas channel/electricity channel as well as cable digging along with other ancillary works in the jurisdiction of yerwada -kalas-dhanori ward office. (part 2)
Read moreof your Industry type