Tender Details

Particulars Details
Title
Ttps Es Circle Mrt I Part Of Cleaning Works Of Junction Boxes And Push Button Boxes Related To Turbine Side Valves In Plant Area Of Unit I Ii Iii For The Period From 01 04 2025 To 31 03 2026
Description
Ttps Es Circle Mrt I Part Of Cleaning Works Of Junction Boxes And Push Button Boxes Related To Turbine Side Valves In Plant Area Of Unit I Ii Iii For The Period From 01 04 2025 To 31 03 2026
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_523652_1
Reference
Number
CE/SE/ES /TTPS /No.52/2025-26
Tender Fee 0
EMD 7600
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=623412
Start Date February 07, 2025 22:35
End Date

24/02/2025 ( Expired 125 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Read more
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot

Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot

Read more
Ttps operation circle cad acwph reconditioning of 450 nb gate valves of acw pump unit i, ii and iii

Ttps operation circle cad acwph reconditioning of 450 nb gate valves of acw pump unit i, ii and iii

Read more
Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system

Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system

Read more
Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul

Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul

Read more
Nctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii

Nctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii

Read more
Nctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii

Nctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii

Read more
Nctps i es circle em i dn s dn i annual maintenance works in generator transformers unit auxiliary transformers and station transformers of unit i ii iii during the annual capital overhauling period for the year 2025 26 at nctps i

Nctps i es circle em i dn s dn i annual maintenance works in generator transformers unit auxiliary transformers and station transformers of unit i ii iii during the annual capital overhauling period for the year 2025 26 at nctps i

Read more
Nctps i es circle em ii dn sdn i unit i complete cleaning and maintenance of ht motors 12 nos to be carried out during the annual overhauling work of unit i for the year 2025 26

Nctps i es circle em ii dn sdn i unit i complete cleaning and maintenance of ht motors 12 nos to be carried out during the annual overhauling work of unit i for the year 2025 26

Read more
Annual housekeeping work of 220 132 33 kv grid sub station lalmatia for the period from 01 07 2025 to 31 03 2026 i e 9 months for f y 2025 26

Annual housekeeping work of 220 132 33 kv grid sub station lalmatia for the period from 01 07 2025 to 31 03 2026 i e 9 months for f y 2025 26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise