Particulars | Details |
---|---|
Title |
Replica In Situ Metallography Analysis Of Re Heater Front And Rear Coils Of Unit 2
|
Description |
Replica In Situ Metallography Analysis Of Re Heater Front And Rear Coils Of Unit 2
|
Organisation | NLC Tamilnadu Power Ltd | Public Sector Undertakings |
Tender Id | 2425010011 |
Reference Number |
2425010011 |
Tender Fee | 0 |
EMD | 51000 |
Tender Value | |
Place | Tuticorin |
Link | https://procure.nlcindia.in/specification/tender/2425010011 |
Start Date | October 15, 2024 22:30 |
End Date |
04/11/2024 ( Expired 216 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreRe-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)